FIELD: mining.
SUBSTANCE: method of working-out backfilling in flooded potassium mine involves well drilling, preparation of pulp by mixing carrying liquid and solid particles, supply of pulp through wells to flooded working-outs, and backfilling of working-outs. Drilling of injection well and well for liquid pumping-out is performed from day surface to flooded working-out meant for backfilling. Carrying liquid for pulp preparation is taken from flooded backfilled working-out on the level of its soil through the nearest well of the drilled wells. After excess pressure appears on the mouth of the injection well, pulp is supplied continuously; total supply volume of pulp solid particles to the mine through the injection well does not exceed the volume of possible liquid filtration through a sinkhole formed during flooding of potassium mine.
EFFECT: invention allows reducing the deposition of ground surface above flooded mine owing to preventing probable leaching.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PREVENTION OF FLOODING OF POTASSIUM MINES AND HAZARDOUS DEFORMATIONS OF EARTH SURFACE AT UNDERGROUND WATER INRUSH INTO MINES | 2007 |
|
RU2341658C1 |
METHOD FOR DEVELOPING KIMBERLITE DEPOSITS | 2017 |
|
RU2664281C1 |
SALINA DEVELOPMENT METHOD | 2009 |
|
RU2438017C2 |
METHOD FOR SECONDARY TREATMENT OF SALT BED | 2011 |
|
RU2468206C1 |
METHOD FOR PREVENTING FLOODING OF POTASSIUM MINES | 1997 |
|
RU2133342C1 |
METHOD FOR RECONSTRUCTION OF A FLOODED MINE MINED BY OPEN-UNDERGROUND METHOD | 2023 |
|
RU2798370C1 |
METHOD FOR HYDRAULIC FILLING OF CHAMBERS | 2010 |
|
RU2449130C1 |
METHOD FOR POTASSIUM MINE PROTECTION AGAINST FLOODING | 2004 |
|
RU2273734C1 |
DISPOSAL OF POTASSIUM CONCENTRATION WASTES | 2013 |
|
RU2522120C1 |
METHOD OF HYDRAULIC LAYING OF WORKED SPACE IN MINING COAL BEDS | 0 |
|
SU1763661A1 |
Authors
Dates
2013-03-10—Published
2011-10-20—Filed