FIELD: mining engineering.
SUBSTANCE: method includes drilling of wells in inter-chamber pillars, laying of bottom-hole pulp line, supply of pulp to deposited chamber through wells. In this case, the pulp line is laid in perpendicular to bottomhole pulp line through the wells for the whole length of chamber block, the holes are made in it above each chamber for feeding pulp and successive backfilling of block chambers is carried out.
EFFECT: reduced duration of backfilling operations and reduction of labour input due to laying of one bottom-hole pulp line into the block of chambers.
4 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR HYDRAULIC FILLING OF CHAMBERS | 2010 |
|
RU2449130C1 |
METHOD OF REMOVING BRINE DURING FILLING CHAMBERS | 2018 |
|
RU2693086C1 |
METHOD FOR HYDRAULIC FILL OF CHAMBERS | 0 |
|
SU1788299A1 |
METHOD FOR HYDRAULIC FILLING OF LONG SINGLE MINE WORKINGS | 2008 |
|
RU2384711C1 |
HYDRAULIC FIILING OF CHAMBERS | 0 |
|
SU1666772A1 |
METHOD OF HYDRAULIC FILL OF CHAMBERS ON GENTLY SLOPING BEDS | 1999 |
|
RU2166639C1 |
METHOD OF GOB HYDRAULIC FILL | 1999 |
|
RU2166638C1 |
DISPOSAL OF POTASSIUM CONCENTRATION WASTES | 2013 |
|
RU2522120C1 |
METHOD OF WORKING-OUT BACKFILLING IN FLOODED POTASSIUM MINE | 2011 |
|
RU2477371C1 |
METHOD OF MINING A SERIES OF ADJOINING STRATA WITH COMPLEX HYPSOMETRY | 0 |
|
SU1555491A1 |
Authors
Dates
2017-11-20—Published
2016-10-19—Filed