FIELD: oil and gas industry.
SUBSTANCE: device includes tubing string, packers installed above formations and arranged in tubing string, coupling arranged under packers with non-crossing longitudinal and radial channels. At that axial channel of the coupling arranged above is larger than that of the coupling arranged below. In device there are two or three replaceable dosing plugs installed in couplings. Couplings housings are provided with dosing nozzles. Each plug corresponds to size of coupling axial channel where the plug is to be installed. Lowering and removal of plugs is to be done using a grab on wire or rope with hook to upper plug.
EFFECT: possibility of agent pumping to two or three formations and of control of pumped agent flow in formations.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND DEVICE FOR CONTROLLED PUMPING DOWN TO FORMATIONS | 2012 |
|
RU2495235C1 |
DEVICE FOR INVESTIGATION AND OPERATION OF WELL DRILLED INTO RESERVOIR MADE UP OF TWO INTERLAYERS | 1994 |
|
RU2084625C1 |
METHOD AND DEVICE FOR ADJUSTABLE INJECTION OF FLUID TO LAYERS WITH AUTOMATED MEASURING OF PROCESS PARAMETERS | 2015 |
|
RU2610484C9 |
METHOD OF OPERATION OF AN INJECTION WELL OF A SMALL DIAMETER WITH A SINGLE LIFT TWO-PACKER ARRANGEMENT | 2017 |
|
RU2678745C1 |
METHOD OF SIMULTANEOUS-SEPARATE PRODUCTION OF WELL FLUID AND INJECTION OF LIQUID INTO WELL AND EJECTOR PLANT FOR ITS IMPLEMENTATION (VERSIONS) | 2016 |
|
RU2633852C2 |
SEPARATE MAINTENANCE PROCESS FOR INJECTION OR PRODUCTION WELL AND IMPLEMENTATION VARIANTS | 2006 |
|
RU2328590C1 |
METHOD OF INJECTION WELL OPERATION WITH SINGLE-LIFT MULTI-PACKER ASSEMBLY | 2017 |
|
RU2655547C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSIT | 2017 |
|
RU2669950C1 |
METHOD AND ARRANGEMENT FOR CONTROLLED INJECTION OF LIQUID THROUGH FORMATIONS | 2017 |
|
RU2636842C1 |
METHOD FOR OPERATING INJECTOR WITH MULTIPLE PACKER ASSEMBLY | 2014 |
|
RU2541982C1 |
Authors
Dates
2012-05-20—Published
2009-10-05—Filed