FIELD: construction.
SUBSTANCE: method includes tunnelling a through well, stretching of a thermal stabiliser in a direction opposite to the well tunnelling direction, which comprises coolant-charged pipes of the condenser and the evaporator, joined with bellows sleeves that are reinforced by bands. Condenser pipes are arranged along the edges of the thermal stabiliser. Stretching is carried out to the position, in which condenser pipes will be installed above the soil surface. Cooling elements are installed on each of the condenser pipes.
EFFECT: higher manufacturability of the installation process, reduced time of installation, increased reliability, lower cost of installation.
7 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
HEAT SETTING OF GROUNDS | 2016 |
|
RU2661167C2 |
METHOD FOR INSTALLATION OF LIGHT COOLING DEVICES FOR TEMPERATURE STABILIZATION OF PERMANENTLY FROZEN GROUNDS | 2015 |
|
RU2591272C1 |
METHOD OF INSTALLING HEAT STABILIZERS IN VENTILATED UNDERGROUND OF OPERATED BUILDINGS | 2016 |
|
RU2627793C1 |
SOIL THERMAL STABILIZER WITH UNDERGROUND VERSION OF CONDENSER PART | 2023 |
|
RU2816611C1 |
DEVICE FOR TEMPERATURE STABILISATION OF PERMANENTLY FROZEN GROUNDS | 2014 |
|
RU2556591C1 |
METHOD FOR ASSEMBLING COOLING DEVICES FOR TEMPERATURE STABILIZATION OF PERMAFROST SOILS UNSTABLE IN WELL WALLS | 2016 |
|
RU2634315C1 |
METHOD FOR HEAT STABILIZATION OF PERMAFROST SOILS AND DEVICE FOR ITS IMPLEMENTATION | 2015 |
|
RU2620664C1 |
DEVICE FOR COOLING PLASTIC-FROZEN SOIL | 2021 |
|
RU2755770C1 |
METHOD OF CONSTRUCTION AND INSTALLATION OF PILES IN PERMAFROST ZONES USING HEAT STABILIZATION COUPLINGS | 2023 |
|
RU2818341C1 |
THREE-CIRCUIT SYSTEM OF ALL-SEASON THERMAL STABILIZATION OF PERMAFROST SOILS OF BASES | 2021 |
|
RU2768247C1 |
Authors
Dates
2012-06-27—Published
2010-10-08—Filed