FIELD: mining.
SUBSTANCE: technology includes tunnelling wells 1 to supply a hydraulic fluid into a payout bed 2, where operation wells 3 also stretch. The bed rock is developed with the help of autonomous drilling devices 4, from the mines 5 a bore mud is carried in an upward flow to a head of wells 3, directing further for enrichment in hydraulic pneumatic cyclones 6. Removal of the developed rock from the bottomhole is carried out with the help of an upward gas flow or with the help of the same working fluid spent at the bottomhole, but together with a liquid phase containing inclusions of ore, which is raised to a head of wells 3 by pressure of gas phases produced by a device 4, at the same time a mineral is partially recovered due to introduction of hydrogen and carbon oxide into a gas medium, establishment of conditions for reheating of rock particles, produced by a high-temperature agent of a thermal gas generator of a drilling device.
EFFECT: enhancing effectiveness and reliability of a production process.
5 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPMENT OF WATER-BEARING DEPOSIT OF IRONSTONE ORES OF OOLITIC STRUCTURE | 2015 |
|
RU2600229C2 |
METHOD OF PRODUCING METAL PRODUCT AT FIELD OF OOLITIC IRON ORES, AND PROCESS TRAIN FOR ITS IMPLEMENTATION | 2015 |
|
RU2572896C2 |
METHOD FOR ENVIRONMENTAL DEVELOPMENT OF IRON-ORE DEPOSIT | 2018 |
|
RU2707611C2 |
METHOD FOR DEVELOPMENT OF DEEP WATER-FLOODED DEPOSIT OF OOLITIC WASTE OF IRONSTONE ORES | 2015 |
|
RU2594912C2 |
PLANT TO EXTRACT HARD ORE FROM THIN BEDS BY DRILLING-OUT | 2012 |
|
RU2486339C1 |
TECHNOLOGY OF WELL CONSTRUCTION IN GEOLOGICAL STRUCTURES | 1999 |
|
RU2161245C1 |
METHOD TO PRODUCE MINERAL RESOURCES | 1990 |
|
RU2029866C1 |
METHOD FOR RECOVERY OF MINERAL DEPOSITS BY LEACHING | 0 |
|
SU1777621A3 |
METHOD OF ENRICHING AQUEOUS PRODUCT SOLUTION DURING WINTER SEASON AND AUTOMATIC CONTROL SYSTEM FOR IMPLEMENTATION THEREOF | 2019 |
|
RU2722675C1 |
METHOD OF ENRICHMENT OF AQUEOUS PRODUCT SOLUTION DURING WINTER SEASON AND ACTUATOR FOR IMPLEMENTATION THEREOF | 2019 |
|
RU2722676C1 |
Authors
Dates
2012-07-10—Published
2011-02-15—Filed