FIELD: oil and gas production.
SUBSTANCE: method includes gaslift well operation by adjusting the flow rate of working and produced gas. The withdrawal of produced gas is done by tubing string and additional tubing string. The flow rate of working and produced gas is adjusted by opening and closing of driven shut-off elements in accordance to the control signals. Control signals come from automatic control unit and are generated according to the results of measured values compared with set parameter values. Note that the pressure is measured in the mouth and bottom hole, at the same time the flow rate of produced gas is measured. The flow rate of working and produced gas is adjusted in such a way to provide the specified well operation mode.
EFFECT: increase of well operation efficiency, reduction of level and removal of fluid accumulated in bottom-hole zone, provision of well operation stability.
2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF UNINTERRUPTED OPERATION OF GAS AND GAS CONDENSATE WELLS, PROVIDING REMOVAL OF ACCUMULATED BOTTOMHOLE FLUID | 2019 |
|
RU2722897C1 |
OPERATING METHOD OF FLOODED GAS WELLS, AND DEVICE FOR ITS IMPLEMENTATION | 2012 |
|
RU2484239C2 |
METHOD OF SUPPLY OF HYDROCARBONS FROM WATERING OUT FORMATION | 2009 |
|
RU2393343C1 |
METHOD FOR OPERATIONAL CONTROL OF GAS-LIFT WELL | 1998 |
|
RU2139416C1 |
METHOD OF GAS WELL OPERATION | 2019 |
|
RU2722899C1 |
METHOD FOR OPERATION OF GAS AND GAS CONDENSATE WELLS | 2022 |
|
RU2792961C1 |
DEVICE FORMING STRUCTURE OF GAS AND FLUID FLOW IN WELLS | 2000 |
|
RU2221132C2 |
METHOD FOR GAS-LIFTING OPERATION OF WELL - CONTINUOUS-DISCONTINUOUS GAS-LIFT AND DEVICE FOR REALIZATION OF SAID METHOD | 2003 |
|
RU2239696C1 |
GAS WELL OPERATION METHOD | 2012 |
|
RU2513942C2 |
METHOD OF OPTIMAL OPERATION OF GAS AND GAS CONDENSATE WELLS WITH HIGH LIQUID CONTENT | 2018 |
|
RU2706283C2 |
Authors
Dates
2012-07-10—Published
2010-06-07—Filed