FIELD: construction.
SUBSTANCE: method to raise a road manhole in construction of roads is implemented in accordance with the following sequence: installation of a manhole ceiling slab at an earth bed level, closure of a manhole frame with a closing sheet, fixation of coordinates of a raised manhole centre, subsequent laying of a road surface layer above a manhole without raising a frame, taking out coordinates of a raised manhole centre, application of tool borders, installation of a tool, cutting a cylindrical channel in a road surface with a facet on top of the cylindrical channel, extraction of the cut fragment of the road surface, withdrawal of the closing sheet, lifting the manhole frame with installation of the manhole body to the elevation in the level of the upper layer of the surface; filling of cavities formed in process of works production with a quick-hardening shrink-resistant filler with subsequent pressing; arrangement of an asphalt-concrete coating with subsequent compaction.
EFFECT: development of an accurate method to raise a manhole when constructing new roads, providing for a tight and evenly distributed road surface around a manhole.
7 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF AND DEVICE FOR RECONDITIONING OF INSPECTION PIT HATCHES | 1994 |
|
RU2085661C1 |
METHOD TO REPLACE SUPPORT BOARD OF WELL IN TRAFFIC AREA OF MOTOR ROADS | 2010 |
|
RU2453661C2 |
MANHOLE HATCH | 2004 |
|
RU2286425C2 |
METHOD FOR MANHOLE CHIMNEY AND COVER REPLACEMENT | 2003 |
|
RU2266370C2 |
INSPECTION CHAMBER HATCH | 2007 |
|
RU2361040C1 |
ROAD SURFACE REPAIR METHOD | 2023 |
|
RU2820194C1 |
WELL HATCH WITH HEIGHT AND TILT ADJUSTABLE DURING OPERATION | 2012 |
|
RU2504619C1 |
METHOD OF CONSTRUCTING ROAD COATING | 0 |
|
SU947256A1 |
METHOD FOR ARRANGEMENT OF URBAN ROAD SURFACES | 2013 |
|
RU2536542C1 |
METHOD FOR CONSTRUCTING ROAD PAVEMENT | 0 |
|
SU1035114A1 |
Authors
Dates
2012-08-27—Published
2010-10-28—Filed