FIELD: mining.
SUBSTANCE: flushing pulp is delivered in stages forming several layers between which drain pipes are installed using leakproof hose parallel to longitudinal axis of flushed space. Drain pipes are attached by one end to leakproof hose. Each drain pipe is extended till it reaches opposite dam, then the housing is detached from drain pipe through the opening in filter dam and is removed for further use. When installation of project quantity of drain pipes is completed, process of flushing pulp delivery is resumed.
EFFECT: improving efficiency of flushing works due to reduction of flushing pulp runoff period.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF HYDRAULIC FILL | 2012 |
|
RU2498078C1 |
METHOD OF HYDRAULIC FILL | 2012 |
|
RU2498077C1 |
ERECTION OF FILLING MASS AT WORKING OF DEPOSITS UNDER PERMAFROST CONDITIONS | 2014 |
|
RU2570698C1 |
CREATION OF FILLING MASSIF AT DEVELOPMENT OF DEPOSIT UNDER PERMAFROST CONDITIONS | 2013 |
|
RU2521234C1 |
METHOD FOR HYDRAULIC FILLING OF LONG SINGLE MINE WORKINGS | 2008 |
|
RU2384711C1 |
METHOD OF FILLING-IN WORKED AREA | 0 |
|
SU1724894A1 |
METHOD OF HYDRAULIC FILL OF CHAMBERS ON GENTLY SLOPING BEDS | 1999 |
|
RU2166639C1 |
METHOD OF HYDRAULIC FILLING-UP OF MINE WORKING | 0 |
|
SU989105A1 |
METHOD FOR DEHYDRATING FILLING BLOCK IN CARRYING OUT HYDRAULIC FILLING OF CHAMBERS IN SEAMS CONTAINING WATER-SOLUBLE MINERALS AND SOLUTION DISCHARGE CONDUITS | 0 |
|
SU1677343A1 |
METHOD OF REMOVING BRINE DURING FILLING CHAMBERS | 2018 |
|
RU2693086C1 |
Authors
Dates
2012-09-27—Published
2011-04-08—Filed