FIELD: mining.
SUBSTANCE: method of hydraulic fill, includes erection of a retaining and a filtering link, erection of a pulp line, supply of the filling pulp and water drainage via drain windows in links. In the filled space drainage pipes are installed in a tight shell, under which they arrange floats connected to each other by means of a flexible connection with a pitch of h, m. The pitch h is taken from the expression h>20D, where D - external diameter of the drainage pipe, m. During supply of filling pulp, compressed air is supplied into drainage pipes, besides, after filling of the filled space floats are withdrawn and used again.
EFFECT: reduction of the period of filling pulp dehydration.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
ERECTION OF FILLING MASS AT WORKING OF DEPOSITS UNDER PERMAFROST CONDITIONS | 2014 |
|
RU2570698C1 |
METHOD OF HYDRAULIC FILL | 2012 |
|
RU2498078C1 |
CREATION OF FILLING MASSIF AT DEVELOPMENT OF DEPOSIT UNDER PERMAFROST CONDITIONS | 2013 |
|
RU2521234C1 |
METHOD OF HYDRAULIC FLUSHING | 2011 |
|
RU2462599C1 |
METHOD FOR HYDRAULIC FILLING OF LONG SINGLE MINE WORKINGS | 2008 |
|
RU2384711C1 |
METHOD FOR DEHYDRATING FILLING BLOCK IN CARRYING OUT HYDRAULIC FILLING OF CHAMBERS IN SEAMS CONTAINING WATER-SOLUBLE MINERALS AND SOLUTION DISCHARGE CONDUITS | 0 |
|
SU1677343A1 |
METHOD OF HYDRAULIC FILL OF CHAMBERS ON GENTLY SLOPING BEDS | 1999 |
|
RU2166639C1 |
METHOD FOR HYDRAULIC FILL OF CHAMBERS | 0 |
|
SU1788299A1 |
METHOD OF REMOVING BRINE DURING FILLING CHAMBERS | 2018 |
|
RU2693086C1 |
FACE-ADJOINING SLIME COLLECTOR | 0 |
|
SU900041A1 |
Authors
Dates
2013-11-10—Published
2012-06-04—Filed