FIELD: mining.
SUBSTANCE: proposed method comprises construction of drainage dam, erection of pulp duct, feed of backfill pump and drainage of water via drain openings in bulkheads mounted on the side opposite the pulp feed. Drainage pipes in soluble airtight shell are fitted in filled goaf. Cooled compressed air is fed to said pipes at the feed of filling pulp. Note here that dressing tails thickened to pasty state are used as a filling pulp.
EFFECT: shorter pulp dewatering interval, higher strength of backfill.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
ERECTION OF FILLING MASS AT WORKING OF DEPOSITS UNDER PERMAFROST CONDITIONS | 2014 |
|
RU2570698C1 |
METHOD OF HYDRAULIC FILL | 2012 |
|
RU2498077C1 |
METHOD OF HYDRAULIC FILL | 2012 |
|
RU2498078C1 |
METHOD OF HYDRAULIC FLUSHING | 2011 |
|
RU2462599C1 |
METHOD FOR HYDRAULIC FILLING OF LONG SINGLE MINE WORKINGS | 2008 |
|
RU2384711C1 |
METHOD OF HYDRAULIC FILL OF CHAMBERS ON GENTLY SLOPING BEDS | 1999 |
|
RU2166639C1 |
METHOD FOR HYDRAULIC FILL OF CHAMBERS | 0 |
|
SU1788299A1 |
METHOD FOR HYDRAULIC FILLING OF CHAMBERS | 2010 |
|
RU2449130C1 |
METHOD OF FILLING-IN EXCAVATED SPACE | 0 |
|
SU787685A1 |
METHOD OF REMOVING BRINE DURING FILLING CHAMBERS | 2018 |
|
RU2693086C1 |
Authors
Dates
2014-06-27—Published
2013-01-29—Filed