FIELD: mining.
SUBSTANCE: claimed process comprises erection of retaining and filtering dam, erection of pulp duct, feed of filling pulp and water drain via drain openings in dams and rain pipes in soluble airtight shell. Simultaneously, cooled air is fed therein via drain openings in said dams located on the side opposite said of pulp feed. Note here that drain pipes are laid over the length of filling space and shaped to the spring. Floats are secured at the spring turn top part. Weights are secured at the spring turn bottom part. Spring maximum OD is taken to make not over 0.9h where h is the filling space height, m. Cooling air is fed intermittently.
EFFECT: shorter period of the filling pulp dewatering, higher strength of filling massif.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
CREATION OF FILLING MASSIF AT DEVELOPMENT OF DEPOSIT UNDER PERMAFROST CONDITIONS | 2013 |
|
RU2521234C1 |
METHOD OF HYDRAULIC FILL | 2012 |
|
RU2498077C1 |
METHOD OF HYDRAULIC FILL | 2012 |
|
RU2498078C1 |
METHOD OF HYDRAULIC FLUSHING | 2011 |
|
RU2462599C1 |
METHOD FOR HYDRAULIC FILLING OF LONG SINGLE MINE WORKINGS | 2008 |
|
RU2384711C1 |
METHOD OF FILLING-IN WORKED AREA | 0 |
|
SU1724894A1 |
METHOD OF HYDRAULIC FILL OF CHAMBERS ON GENTLY SLOPING BEDS | 1999 |
|
RU2166639C1 |
METHOD OF FILLING-IN EXCAVATED SPACE | 0 |
|
SU787685A1 |
METHOD OF FORMATTING ICE-ROCK STOW IN MINE WORKING | 1998 |
|
RU2150586C1 |
METHOD FOR HYDRAULIC FILLING OF CHAMBERS | 2010 |
|
RU2449130C1 |
Authors
Dates
2015-12-10—Published
2014-11-18—Filed