FIELD: construction.
SUBSTANCE: in the method for construction of roads on frozen soils protective elements in the form of a movable car-dome are installed to ensure tightness of their connection with a road foundation, and negative temperature is created inside a car-dome, road foundation is prepared, an earthfill is filled inside the car-body along its entire length, and the car-dome is moved along the road route axis to the distance equal to the distance of the car-dome length. Besides, at least two air impermeable car-domes are installed as arranged one after the other, the first of which is designed to prepare a frozen foundation, and the second one - to fill an earthfill.
EFFECT: higher efficiency of earthfill construction on frozen soils and its stability during operation.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONSTRUCTION OF ROADS ON FROZEN SOILS | 2016 |
|
RU2641352C1 |
METHOD FOR ERECTION OF EMBANKMENT ON FROZEN SOILS | 2008 |
|
RU2378446C2 |
EMBANKMENT OF THE RAILROAD ON PERMAFROST SOILS | 2017 |
|
RU2657310C1 |
METHOD TO ERECT EMBANKMENT ON FROZEN SOILS | 2010 |
|
RU2453649C2 |
EMBANKMENT ON FROZEN SOIL | 2008 |
|
RU2360063C1 |
PROCESS OF ERECTION OF EARTHEN STRUCTURES WITH ADHERENCE TO INCREASED ECOLOGICAL REQUIREMENTS IN NORTHERN REGIONS | 2002 |
|
RU2221101C2 |
METHOD OF LAYING PIPELINES ON GROUND | 2006 |
|
RU2317466C1 |
METHOD OF ERECTING EMBANKMENT | 0 |
|
SU1615285A1 |
METHOD FOR ERECTING EMBANKMENT FROM SUBSTANDARD SOILS ON PERMAFROST | 2016 |
|
RU2647517C1 |
EMBANKMENT ON FROZEN SOIL | 2008 |
|
RU2379405C1 |
Authors
Dates
2012-10-20—Published
2011-02-24—Filed