FIELD: construction.
SUBSTANCE: plant to prepare snow mass for melting comprises a melting chamber, a receiving hopper and a movable grid. The grid is installed along the perimetre of the melting chamber. The grid is arranged from two sections of driving shafts. Sections are made as capable of shaft-to-shaft adjustment between each other. Each section comprises horizontal shafts. Each of shafts is connected to a reversible gear motor and is equipped with disks. Hammers are fixed between pairs of discs. Shafts are arranged in parallel to direction of hopper loading and are enclosed in jackets. Jackets are installed on a frame common for a section of shafts.
EFFECT: higher efficiency and operational manoeuvrability of transport during plant loading.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE TO PREPARE SNOW MASS FOR MELTING | 2011 |
|
RU2456402C1 |
PLANT FOR ICE BULK PREPARATION FOR THAWING | 2011 |
|
RU2460842C1 |
DEVICE TO PREPARE SNOW MASS FOR MELTING | 2012 |
|
RU2495188C1 |
PLANT TO PREPARE SNOW MASS FOR MELTING | 2012 |
|
RU2499864C1 |
DEVICE TO PREPARE SNOW MASS FOR MELTING | 2010 |
|
RU2424395C1 |
PLANT FOR PREPARING SNOW MASS FOR MELTING | 2008 |
|
RU2379413C1 |
INSTALLATION FOR PREPARATION OF SNOW MASS FOR MELTING | 2008 |
|
RU2360067C1 |
DEVICE FOR PREPARATION OF SNOW MASS TO THAWING | 2007 |
|
RU2343249C1 |
SNOW-MELTING PLANT | 2002 |
|
RU2224850C1 |
SNOW MELTER | 0 |
|
SU949046A1 |
Authors
Dates
2012-10-20—Published
2011-02-25—Filed