FIELD: construction.
SUBSTANCE: dam comprises an antifiltration element in the form of a core from clayey soil, upper and lower side prisms from macrofragmental soils, a head of nonfrost-susceptible soil, an asphalted road surface of a dam crest traffic area and sorted stones. Sorted stones are orderly laid onto a dam slope illuminated with sunlight from its crest to the specified level, where they form open pores between each other. Open pores are partially filled with a soil material. At the same time the following conditions are met: ωp>0.2D2 s and hf =(03-0.5)Hp, where ωp - area of open pore clear space along its depth; Ds - mean average diameter of stones that form an open pore; hf - height of open pore filling with soil material; Hp - open pore depth.
EFFECT: higher reliability of a dam due to prevention of permafrost formation in the upper part of its core.
5 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
DAM FROM SOIL MATERIALS | 2011 |
|
RU2465395C1 |
ROCK AND EARTH DAM | 2011 |
|
RU2474645C1 |
ROCK AND EARTH DAM | 2011 |
|
RU2474646C1 |
EARTH DAM | 2001 |
|
RU2207428C2 |
SECTION OF MOTOR ROAD WITH CULVERT UNDER EMBANKMENT IN CONDITIONS OF NORTHERN CONSTRUCTION-CLIMATIC ZONE | 2009 |
|
RU2385983C1 |
HYDROTECHNICAL CHANNEL UNDER CONDITIONS OF PERMAFROST SOILS OF SLOPE | 2009 |
|
RU2392376C1 |
GROUND DAM BUILT ON PERMAFROST BASE | 2006 |
|
RU2309220C1 |
WATER-ENGINEERING SYSTEM ON PERPETUALLY FROZEN SOILS | 2008 |
|
RU2374387C1 |
DAM | 1997 |
|
RU2123556C1 |
WATER ENGINEERING SYSTEM ON PERMAFROST SOILS | 2010 |
|
RU2416692C1 |
Authors
Dates
2012-12-10—Published
2011-07-20—Filed