FIELD: construction.
SUBSTANCE: dam comprises an anti-filtration element in the form of a core from clayey soil, upper and lower side prisms from large fragmental soils, a head wall from non-heaving soil and a road surface on a dam crest traffic area. The material of at least the road surface has a coefficient of solar radiation absorption of at least 0.9. The road surface of the dam crest traffic area is made from asphaltic concrete.
EFFECT: higher reliability of a dam due to prevention of freezing of its core upper part.
5 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
DAM OF SOIL MATERIALS | 2011 |
|
RU2469147C1 |
ROCK AND EARTH DAM | 2011 |
|
RU2474645C1 |
ROCK AND EARTH DAM | 2011 |
|
RU2474646C1 |
EARTH DAM | 2001 |
|
RU2207428C2 |
SECTION OF MOTOR ROAD WITH CULVERT UNDER EMBANKMENT IN CONDITIONS OF NORTHERN CONSTRUCTION-CLIMATIC ZONE | 2009 |
|
RU2385983C1 |
GROUND DAM BUILT ON PERMAFROST BASE | 2006 |
|
RU2309220C1 |
DAM | 1997 |
|
RU2123556C1 |
PIPE CULVERT UNDER BANKED EARTH IN CONDITIONS OF NORTHERN CLIMATIC BUILDING ZONE AND OPERATION METHOD THEREOF | 2009 |
|
RU2381328C1 |
UNIT OF GROUND DAM COUPLING WITH CONCRETE OVERFLOW WEIR | 2011 |
|
RU2448214C1 |
HYDROTECHNICAL CHANNEL UNDER CONDITIONS OF PERMAFROST SOILS OF SLOPE | 2009 |
|
RU2392376C1 |
Authors
Dates
2012-10-27—Published
2011-06-22—Filed