FIELD: oil and gas industry.
SUBSTANCE: well is filled with liquid nitrogen, tubing string is removed from the well and there performed is the control for freezing rocks and fluids adjacent to the well. After formation of shut-off plug in well and fluid fountain blocking the cement grouping is pumped into the zone above the well and pressure in well is maintained till its hardening.
EFFECT: elimination of emergency situations at fields.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ELIMINATING A GAS BLOWOUT IN WELLS IN OFFSHORE CONDITIONS | 2022 |
|
RU2803086C1 |
METHOD OF EMERGENCY KILLING OF FLOWING GAS WELL IN PRESENCE OF PERMAFROST ROCKS | 2015 |
|
RU2591866C1 |
METHOD OF GAS AND GAS CONDENSATE WELLS CASING STRING LEAKAGE SEALING | 2008 |
|
RU2382170C1 |
PROCEDURE FOR REPAIR OPERATIONS IN WELL | 2009 |
|
RU2423599C2 |
METHOD FOR ELIMINATION OF BEHIND-THE-CASING WATER INFLUX INTO WELL OF DEVIATED PROFILE EQUIPPED WITH LINER-FILTER | 2024 |
|
RU2839423C1 |
METHOD FOR PRODUCTION OF HARD-TO-RECOVER LIQUID MINERALS PRONE TO TEMPERATURE PHASE TRANSITION | 2024 |
|
RU2840848C1 |
METHOD OF RECOVERY OF BOTTOM-HOLE FORMATION ZONE OF GAS WELL | 2000 |
|
RU2183724C2 |
METHOD FOR WELL CONSTRUCTION IN COMPLICATED CONDITIONS | 2016 |
|
RU2630519C1 |
METHOD FOR ELIMINATING FLOWS BEHIND THE CASING IN PETROLEUM PRODUCTION BOREHOLES | 2021 |
|
RU2774251C1 |
PROCEDURE FOR TREATMENT OF BOTTOMHOLE ZONE OF WELL | 2010 |
|
RU2422619C1 |
Authors
Dates
2013-01-27—Published
2011-03-21—Filed