FIELD: oil and gas industry.
SUBSTANCE: method for increasing the extraction in the reservoir bed involves the swabbing tests in the pipe at some depth. The pipe is arranged in the well shaft. Some part of the well shaft is locate inside the reservoir bed. From time to time, pressure is measured in lower part of the pipe using a pressure gauge in order to obtain a variety of pressure measurements during the swabbing test. Pressure gauge is attached to inner wall of lower pipe part. Variety of velocities of the fluid flowing from reservoir bed is determined through perforations made in the well shaft to the pipe using the flow velocity equation and variety of pressure measurements.
EFFECT: improving the information acquisition efficiency.
20 cl, 8 dwg
Title | Year | Author | Number |
---|---|---|---|
PRELIMINARY ANALYSIS OF DRILLING SITE FOR PLANNING OF DEPOSITE MINING | 2008 |
|
RU2489571C2 |
METHOD FOR COMPLETION OF OIL AND GAS WELLS BY SWABBING AND DEVICE FOR ITS EMBODIMENT | 1996 |
|
RU2121565C1 |
METHOD FOR ROCK SEAM PARAMETER ANALYZING INSIDE WELL | 2003 |
|
RU2317414C2 |
METHODS AND APPARATUS FOR MEASURING STREAMING POTENTIALS AND DETERMINING UNDERGROUND FORMATION CHARACTERISTICS | 2009 |
|
RU2478991C2 |
PROCEDURE FOR WELL SWABBING BY VISCOUS FLUID AND DEVICE FOR ITS IMPLEMENTATION | 2013 |
|
RU2537452C1 |
MEASUREMENT METHODS AND DEVICES FOR FILTRATION POTENTIALS AND DETERMINATION OF CHARACTERISTICS OF UNDERGROUND FORMATION | 2005 |
|
RU2402048C2 |
APPARATUS FOR MEASURING FILTRATION POTENTIAL AND DETERMINING UNDERGROUND FORMATION CHARACTERISTICS | 2008 |
|
RU2453873C2 |
METHOD FOR DETERMINATION OF STRATUM PRODUCTIVITY IN PROCESS OF WELL DRILLING | 2012 |
|
RU2486337C1 |
SIMULATION OF BOTTOM-HOLE ASSEMBLY/DRILLING STRING TRANSIENT MODE DURING DRILLING | 2008 |
|
RU2461707C2 |
METHOD AND SYSTEM FOR DATA CONTEXT SERVICE | 2008 |
|
RU2493590C2 |
Authors
Dates
2013-02-10—Published
2008-09-24—Filed