FIELD: oil-and-gas industry.
SUBSTANCE: method of well swabbing by viscous fluid includes stages where: swab if preliminary run to the viscous fluid border with preset temperature 40°C minimum and 100°C maximum; swab is submersed under the viscous fluid level with preset speed 0.3m/s minimum and 1m/s maximum; power is directly supplied to the swab from surface equipment using the geophysical cable, then the power is supplied through the cable lug by means of the electric energy channel to the swab lower part; electric energy by means of the converter installed in the lower part of the swab is converted to the thermal electric energy and is transmitted under the viscous fluid level ensuring its local heating to temperature of the fluid liquefaction with simultaneous swab run; at that run speed and well fluid temperature are monitored during the entire swab run; in case of deviation of the swab run speed and temperature from the preset values the electric energy quantity supplied from the surface is changed; the viscous fluid sampling and lifting to surface are performed using the swab.
EFFECT: improved efficiency of development of high viscous oil or bitumen well by means of swabbing.
17 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPMENT OF WELLS AND TESTING OF FORMATIONS IN PROCESS OF SWABBING (VERSIONS) | 2007 |
|
RU2341653C1 |
METHOD OF WELL TESTING AND CONTROL IN SWABBING PROCESS | 1999 |
|
RU2166077C2 |
METHOD FOR WELL DEVELOPMENT AND OPERATION AND DEVICE FOR ITS IMPLEMENTATION | 2012 |
|
RU2503798C2 |
METHOD AND DEVICE OF COMPLEX ACTION FOR HEAVY OIL AND BITUMEN PRODUCTION BY MEANS OF WAVE TECHNOLOGY | 2018 |
|
RU2696740C1 |
DEVICE FOR HYDRODYNAMIC MONITORING OF WELLS | 2011 |
|
RU2471984C2 |
METHOD FOR ELECTRICAL MONITORING OF RESERVOIR-COLLECTOR CHARACTERISTICS DURING DEVELOPMENT OF OIL DEPOSITS USING STEAM PUMPING | 2018 |
|
RU2736446C2 |
PRODUCTION SIMULATION METHOD IN OIL WELLS AND DEVICE FOR ITS IMPLEMENTATION | 2012 |
|
RU2520672C2 |
SECONDARY BED DRILLING-IN AT DEPRESSION WITH LOWERING OF PERFORATOR FOR SUBSURFACE PUMP AND DEVICE TO THIS END (VERSIONS) | 2014 |
|
RU2571790C1 |
COMBINED METHOD FOR TUBING CLEANING AND DEVICE FOR ITS IMPLEMENTATION | 2016 |
|
RU2627520C1 |
DOWNHOLE INSTALLATION FOR THE PRODUCTION OF HIGH-VISCOSITY OIL | 2022 |
|
RU2784121C1 |
Authors
Dates
2015-01-10—Published
2013-06-17—Filed