FIELD: mining.
SUBSTANCE: method involves formation of non-working projections, transport offramp, horizontal and inclined safety berms. Inclined safety berms are formed in places of their junction to transport offramp. Slope of sections of inclined safety berms is restricted in compliance with technical characteristics of machines and mechanisms used for cleaning of safety berms from rockslides and rockfalls.
EFFECT: reduction of volume of development operations and improvement of conditions of mechanical cleaning of safety berms from rockslides and rockfalls.
3 cl, 2 ex, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR NON-WORKING PIT WALL FORMING | 2004 |
|
RU2265126C1 |
CONSTRUCTION METHOD OF NON-WORKING OPEN-PIT WALL | 2011 |
|
RU2475648C1 |
QUARRY DEVELOPMENT METHOD | 1996 |
|
RU2118456C1 |
METHOD FOR FORMATION OF NONMINING FLANK OF OPEN PIT UNDER PERMAFROST CONDITIONS | 1995 |
|
RU2099528C1 |
METHOD OF BUILDING-UP OF OPENCAST NON-MINING FLANK | 2002 |
|
RU2213223C1 |
METHOD FOR ARRANGEMENT OF NON-WORKED SIDE OF QUARRY | 1994 |
|
RU2084633C1 |
METHOD OF BUILDING UP OF OPENCAST NONMINING FLANK | 2001 |
|
RU2206748C1 |
METHOD OF CONSTRUCTION OF OPENCAST NONMINING FLANK | 1999 |
|
RU2171893C2 |
METHOD OF OPEN-PIT MINING | 1996 |
|
RU2098627C1 |
METHOD FOR OPENCAST STEEP DEPOSIT MINING | 2005 |
|
RU2294434C1 |
Authors
Dates
2013-02-10—Published
2011-03-11—Filed