FIELD: engines and pumps.
SUBSTANCE: waste gas processing system 1 mounted on ICE 2 of transport facility 3 comprises, at least, one discharge pipeline 4, at least, one turbosupercharger 5, at least, one waste gas catalytic neutraliser 6 arranged between ICE 2 and, at least, one turbosupercharger 5 with first chamber 7, at least, one waste gas processing device 9 arranged after, at least, one turbosupercharger 5 with second chamber 8. Note here that volume of first chamber 7 makes, at least, 0.6 l to exceed that of second chamber 8.
EFFECT: efficient operation in various operating conditions.
7 cl, 2 dwg
Authors
Dates
2013-02-10—Published
2008-06-05—Filed