FIELD: process engineering.
SUBSTANCE: invention may be used for water treatment. Proposed method comprises interaction of water, ballast and flocculating agent in flocculation zone 1; introduction of mix in precipitation zone 11; removal of precipitate and ballast from precipitation zone bottom and directing it into mixing zone 19, mixing; withdrawing the mix of precipitate and ballast from zone 19 and feeding into hydraulic cyclone 26; feeding product from hydraulic cyclone bottom into flocculation zone 1; extracting portion of precipitate from hydraulic cyclone top section; circulating remaining portion of precipitate into intermediate zone 19; continuous measurement of concentration of contaminants in water and defining the amount of ballast required to get water of required quality. Proposed device comprises flocculation tank 1 with mixer 2; water feed pipeline 5 to feed water into said tank 1; settler 11 provided with top outlet channel 15; pipeline 21 to communicate settler bottom with intermediate tank 16 with mixer 20; pipeline 25 to communicated tank 19 with hydraulic cyclone 26; pipeline 30 to circulate portion of product from cyclone 26 into intermediate tank 19; pickups 40, 40a, 41, computer 41 for continuous determination and adjustment of ballast amount.
EFFECT: optimised process.
48 cl, 9 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND MACHINE FOR PROCESSING WATER | 2018 |
|
RU2684370C1 |
METHOD AND APPARATUS FOR TREATING WATER | 2018 |
|
RU2688619C1 |
METHOD AND DEVICE FOR WATER TREATMENT | 2006 |
|
RU2421407C2 |
METHOD OF WATER TREATMENT | 2010 |
|
RU2523480C2 |
METHOD OF PURIFYING DRINKING WATER AND STATION FOR ITS IMPLEMENTATION | 2015 |
|
RU2629076C2 |
LIQUID WASTE TREATMENT PLANT | 2020 |
|
RU2778241C2 |
PLANT FOR WATER TREATMENT BY MEANS OF INTEGRATED BALLASTED FLOCCULATION AND DECANTATION, AND CORRESPONDING METHOD | 2018 |
|
RU2769124C2 |
METHOD AND REACTOR FOR PROCESSING BY FLOCCULATION | 2004 |
|
RU2350398C2 |
METHOD OF FLUID PURIFICATION BY FLOTATION | 2009 |
|
RU2502678C2 |
WATER SUPPLY AND DRAINAGE SYSTEM IN WEAVING PRODUCTION | 2023 |
|
RU2817552C1 |
Authors
Dates
2013-02-20—Published
2007-12-26—Filed