FIELD: construction.
SUBSTANCE: method includes forwarding a larger part of Volga run-off from the Zhigulevskoe storage pond bypassing existing hydraulic structures of the Zhigulevskaya HPP along the valley of the Usa River for its supply into water-passage tunnels under a neck between water areas of the Zhigulevskoe and Saratovskoe storage ponds, designed to supply water onto blades of hydraulic turbines of a new hydraulic power plant in the area of the settlement Perevoloki of Samara region, and also for idle discharge of water into the water area of the Saratovskoe storage pond.
EFFECT: invention makes it possible to increase the extent of protection of structures arranged in zones of possible breakthrough of water masses.
2 cl