FIELD: construction.
SUBSTANCE: method includes construction of a new reinforced concrete dam with a spillway, premises for hydraulic units, a fish hoist that is reliably blocked with a new cellular earth dam, and also with devices to let vessels through between upper and lower reaches. Construction is carried out in a pit that is protected against surface drains and ground waters and is dug in dry area. Soils taken from the pit are used to strengthen the existing earth dam. A temporary channel is built designed to divert water from the new dam to the existing spillway of the Krasnodar water-engineering system. Transport streams are changed over to the new dam. Further the bed of a permanent drainage canal is built from a new spillway from Krasnodar reservoir to the Kuban river valley downstream the place where the existing dam of the Krasnodar water-engineering system is placed. Afterwards water is drained from the water area between the new dam and the existing dam of the Krasnodar water-engineering system, and the water area is filled with soil.
EFFECT: more efficient prevention of areas flooding without interruption in operation of all existing facilities.
3 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SUPPLYING BED OF PROJECTED NAVIGATION CANAL "EVRASIYA" WITH RUNNING SWEET WATER | 2008 |
|
RU2471040C2 |
METHOD TO CREATE CONDITIONS TO PREVENT INGRESS OF SLUDGE DEPOSITS FROM VORONEZH STORAGE POND BOTTOM INTO COOLING POND OF NOVOVORONEZH NUCLEAR POWER PLANT | 2008 |
|
RU2485245C2 |
METHOD TO REDUCE LOAD AT RETAINING STRUCTURES OF TSIMLYANSKIY WATER-ENGINEERING SYSTEM | 2009 |
|
RU2479689C2 |
METHOD TO CREATE CONDITIONS FOR PREVENTION OF BALAKOVO NPP AREA FLOODING | 2008 |
|
RU2475588C2 |
METHOD FOR PROTECTION OF TERRITORIES AGAINST FLOODING IN RIVER BASINS | 2006 |
|
RU2389845C2 |
PROCESS PREVENTING FLOODING OF ARABLE LAND BY FLOODWATER OF MOUNTAIN RIVER | 2002 |
|
RU2228996C1 |
METHOD OF PREVENTING DAMAGE FROM FLOODING | 2019 |
|
RU2710164C1 |
SERVICE SPILLWAY OF HPP DAM | 2015 |
|
RU2639046C2 |
FLOOD-CONTROL FILTER DAM | 2014 |
|
RU2552361C1 |
METHOD FOR REGULATING WATER FLOW IN RIVER CHANNELS FOR PREVENTING FLOODS | 2017 |
|
RU2683224C1 |
Authors
Dates
2012-01-20—Published
2010-03-05—Filed