FIELD: hydraulic engineering, measure preventing flood. SUBSTANCE: technique includes erection of water guarding barrier and measures to break ice cover on river. Water guarding barrier is constructed in the form ice embankment frozen right on ice cover of river near bank subjected to flooding with the height exceeding level of anticipated water rise and going to banks with its ends. Cutting of deep notch along line of maximum bending moment with the use of sharp ice cutter at period of its maximum stress breaks ice cover on river. EFFECT: diminished economic damage from flood, improved protection of territory. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO PROTECT PUBLIC AND TERRITORIES AGAINST FLOODS | 2013 |
|
RU2547764C1 |
METHOD FOR PREVENTING OVERFLOW | 2004 |
|
RU2333312C2 |
METHOD TO PROTECT AREA AGAINST FLOODING DURING SPRING FLOOD AND TEMPORARY WATER-BARRIER STRUCTURE FOR ITS REALISATION (VERSIONS) | 2012 |
|
RU2503771C1 |
METHOD FOR FLOOD CONTROL | 2018 |
|
RU2693655C1 |
TEMPORARY WATER ENCLOSING STRUCTURE MADE OF ICE AND SNOW | 2015 |
|
RU2590813C1 |
METHOD FOR RIVER FLOW REGULATION TO PROVIDE FLOOD CONTROL | 2006 |
|
RU2304659C1 |
METHOD FOR REGULATING WATER FLOW IN RIVER CHANNELS FOR PREVENTING FLOODS | 2017 |
|
RU2683224C1 |
ICE BREAKER - ECOLOGIST | 2015 |
|
RU2603890C1 |
PROCESS PREVENTING FLOODING OF ARABLE LAND BY FLOODWATER OF MOUNTAIN RIVER | 2002 |
|
RU2228996C1 |
METHOD OF PREVENTING DAMAGE FROM FLOODING | 2019 |
|
RU2710164C1 |
Authors
Dates
2004-03-20—Published
2002-05-31—Filed