FIELD: mining.
SUBSTANCE: root layer is formed due to removal, loading, transportation and application to the dump surface of overburden rocks from top overburden bench, which consist of fertile soil layer and basement rocks. Then, vegetation cover is formed using the planting material treated with complex biological preparation.
EFFECT: reduction of reclamation periods; increase in durability of cultivated forest and grassy ranges on reclamated lands.
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE OF FORMING AND PREPARING OF EXTERNAL DUMPS AND BORROW CUTS FOR BIOLOGICAL RE-CULTIVATION | 2007 |
|
RU2359127C2 |
METHOD FOR BIOLOGICAL RECLAMATION OF MAN-MADE WATER BODIES IN ARCTIC AND SUBARCTIC CONDITIONS | 2021 |
|
RU2774752C1 |
HINGED UNIT FOR BIOLOGICAL RECULTIVATION OF OVER-COMPACTED CAR DUMPS OF COAL-MINING ENTERPRISES | 2018 |
|
RU2704853C2 |
METHOD FOR FORMATION OF DUMPS FOR TECHNICAL RECULTIVATION IN OPEN DEVELOPMENT OF MINES | 2008 |
|
RU2388912C2 |
METHOD FOR FORMATION OF ROOT LAYER OF DUMP SURFACE FORMED BY OPEN MINING OF MINERALS | 2019 |
|
RU2709713C1 |
METHOD FOR PREPARING THE SURFACE OF AUTOMOBILE DISPLAYS FOR FOREST DIRECTION OF RECLAMATION UNDER DRID CONDITIONS OF COAL MINING | 2021 |
|
RU2779159C1 |
SET OF MECHANICAL AND HYDRAULIC RECULTIVATION OF DISTURBED LANDS | 2014 |
|
RU2569145C1 |
METHOD OF QUARRIES RECLAMATION (VERSIONS) | 2010 |
|
RU2433268C1 |
METHOD OF RECULTIVATION OF LANDS DISTURBED DURING DEVELOPMENT OF ORE DEPOSITS OF MINERAL RESOURCES | 2019 |
|
RU2711926C1 |
COAL STRIP MINING | 2013 |
|
RU2523246C1 |
Authors
Dates
2013-03-27—Published
2011-07-01—Filed