FIELD: construction.
SUBSTANCE: method for construction of clay structures includes formation of a bank with creation of air gaps from a solid combustible material in the form of woodworking wastes impregnated with oil processing wastes. Then the bank is covered with cloth, and clay mixture is applied on top, where inlet and outlet are made. Afterwards the fuel is burned and temperature and burning time are maintained.
EFFECT: structure strength improvement.
5 cl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
DRY TREATMENT MACHINE FOR DRILLING CUTTINGS | 2006 |
|
RU2330731C2 |
DRILLING MUD DISPOSAL METHOD | 2006 |
|
RU2323293C1 |
MIXTURE FOR OBTAINING CONSTRUCTION MATERIAL | 2011 |
|
RU2490224C1 |
PLANT FOR DRILLING MUD DESLUDGING | 2006 |
|
RU2325503C2 |
METHOD OF PROTECTIVE COATING APPLICATION | 2006 |
|
RU2333305C2 |
METHOD OF RECULTIVATION OF SLUDGE PIT UNDER CONDITIONS OF ETERNAL FROST | 2007 |
|
RU2333360C1 |
EARTH SUMP RECLAMATION METHOD | 2004 |
|
RU2273736C1 |
METHOD AND DEVICE FOR THERMAL PROCESSING OF COMBUSTIBLE MATERIALS AND RESIDUE | 2007 |
|
RU2346207C1 |
PROTECTIVE FIRE-FIGHTING APPARATUS OF MAIN PETROLEUM PIPELINE OR PETROLEUM WAREHOUSE | 2020 |
|
RU2758266C1 |
METHOD OF PROCESSING ORGANICS-CONTAINING SLUDGY WASTE WATER SEDIMENT | 2002 |
|
RU2239620C2 |
Authors
Dates
2013-04-10—Published
2011-05-05—Filed