FIELD: earth recovery during drilling work performing.
SUBSTANCE: method involves waterproofing sump walls and bottom; filling thereof with used drilling mud; pumping-out liquid phase and filling thereof with peat and mineral ground. Liquid phase is previously accumulated in the sump and cleaned. Mineral ground, peat and used drilling mud are mixed one with another and supplied to bank slope or to road slope. Then grass is planted on slopes. Cleaned liquid phase is used for grass watering.
EFFECT: increased quality of earth sump reclamation.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR RECLAMATION OF SLUDGE PITS UNDER CONDITIONS OF WARM PERIODS | 2018 |
|
RU2691797C1 |
EARTH STORAGE RECLAMATION METHOD. | 2007 |
|
RU2347908C2 |
METHOD FOR RECULTIVATION OF SLUDGE BARN IN CONDITIONS OF EXTREME NORTH | 2018 |
|
RU2688653C1 |
METHOD OF SLUDGE PITS RECLAMATION WITHOUT THEIR BACKFILLING ON FOREST FUND TERRITORY OF RUSSIAN FEDERATION IN MIDDLE TAIGA SUBZONE OF WESTERN SIBERIA | 2015 |
|
RU2617632C2 |
METHOD OF RESTORING EARTH RESERVOIRS | 1994 |
|
RU2109031C1 |
METHOD OF RECULTIVATION OF SLUDGE PIT UNDER CONDITIONS OF ETERNAL FROST | 2007 |
|
RU2333360C1 |
METHOD OF RECLAMATION OF DRILLING SLUDGE CULVERT | 2018 |
|
RU2702184C1 |
SOIL-SLIME MIX | 2013 |
|
RU2522317C1 |
METHOD OF A STORAGE BARN RECULTIVATION | 2003 |
|
RU2251564C2 |
METHOD FOR DISMOUNTING EARTH STORAGES | 1999 |
|
RU2170304C2 |
Authors
Dates
2006-04-10—Published
2004-09-23—Filed