FIELD: process engineering.
SUBSTANCE: invention relates to construction, namely, to method of fabricating reinforced concrete articles. Method of fabricating prestressed concrete articles by off-form process at long stands comprises laying reinforcements, stretching them and locking at their ends, laying concrete mix of required grade over the stand length with simultaneous formation of bulk and positioning of reinforcements over bulk cross-section unless concrete transfer strength, release of stress and cutting obtained bulk into pieces. Said prestressed reinforcements are stretched at stand thrusts at 0.4-1.0 GPa and represent cable bundles made from continuous glass- and/or basalt-, and/or carbon fibers with tensile strength of 0.6-4.0 GPa. Fibroconrete mix is laid at articles of maximum stress over the stand length.
EFFECT: simplified process.
6 cl; 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO MANUFACTURE NON-METAL REINFORCEMENT ELEMENT WITH PERIODIC SURFACE AND REINFORCEMENT ELEMENT WITH PERIODIC SURFACE | 2011 |
|
RU2482247C2 |
REINFORCEMENT ELEMENT FOR PRESTRESSED CONCRETE STRUCTURES | 2010 |
|
RU2455436C1 |
REINFORCING CAGE AND METHOD OF ITS MANUFACTURING | 2013 |
|
RU2530074C1 |
METHOD OF MONOLITHIC BUILDING, 3D PRINTING METHOD AND DEVICE THEREFOR | 2017 |
|
RU2683447C1 |
METHOD OF PRE-STRESSING COMPOSITE POLYMER REINFORCEMENT RODS AND DEVICE FOR ITS IMPLEMENTATION | 2019 |
|
RU2724077C1 |
AUTOMOBILE ROAD | 2014 |
|
RU2589138C2 |
METHOD OF ANCHOR MANUFACTURE AND ANCHOR | 2015 |
|
RU2619298C1 |
METHOD TO ERECT UNDERGROUND STRUCTURES BY "WALL IN SOIL" METHOD AND WALL IN SOIL ERECTED BY THIS METHOD | 2011 |
|
RU2465401C1 |
COMPOSITE ELEMENT FOR REINFORCEMENT OF ICE STRUCTURES | 2023 |
|
RU2810345C1 |
METHOD FOR FORMATION OF THE ANCHOR DEVICE OF COMPOSITE REINFORCEMENT AND ANCHOR DEVICE | 2021 |
|
RU2776854C1 |
Authors
Dates
2013-05-20—Published
2011-08-18—Filed