FIELD: transport.
SUBSTANCE: disclosed is design of an automobile road of up to 25 t, minimally depending on soil and climate conditions of area of construction. Road for vehicles carrying up to 25 t, consisting of vertical supports, girders and road surface made of concrete plates, vertical supports in form of piles arranged to project a step along road, immersed in soil to target depth with alignment mark goals piles on level planning at height of 0.05-1.95 m. On head piles in parallel to road axis there are crossbars, tightened to each other in long elements with steel cables laid through longitudinal holes of girders. On cross pieces there are prestressed plates of road surface, connected to each other with swaging by steel ropes in longitudinal direction relative to road axis. Pile, crossbars and plates are made in form of prefabricated reinforced concrete prestressed elements.
EFFECT: road at sections where its height above level of planning surface is less than 5/10 m is equipped with ground shoulder, and at sections where height above level of planning greater than 5/10 m - barriers.
2 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MAKING DECORATIVE REINFORCED CONCRETE ARTICLES | 2011 |
|
RU2481946C2 |
METHOD TO ERECT UNDERGROUND STRUCTURES BY "WALL IN SOIL" METHOD AND WALL IN SOIL ERECTED BY THIS METHOD | 2011 |
|
RU2465401C1 |
REINFORCEMENT ELEMENT FOR PRESTRESSED CONCRETE STRUCTURES | 2010 |
|
RU2455436C1 |
METHOD FOR STRUCTURE CONSTRUCTION IN THE UNDER-RUNNER SPACE OF RIVERS AND CANALS IN URBAN DEVELOPMENT | 2021 |
|
RU2770187C1 |
METHOD TO MANUFACTURE NON-METAL REINFORCEMENT ELEMENT WITH PERIODIC SURFACE AND REINFORCEMENT ELEMENT WITH PERIODIC SURFACE | 2011 |
|
RU2482247C2 |
SEPARATE GRADE CROSSING OF MOSCOW RING HIGHWAY AND YAROSLAVSKOYE SHOSSE | 1998 |
|
RU2139384C1 |
COMPLEX FOR CONSTRUCTION OF MOTOR ROAD ON PILES | 2010 |
|
RU2453650C1 |
GROUTING METHOD | 2015 |
|
RU2613700C1 |
METHOD OF CONSTRUCTING GROUND ANCHOR AND GROUND ANCHOR ITSELF | 1997 |
|
RU2131495C1 |
CONSTRUCTION METHOD OF BUILT-IN STRUCTURAL ELEMENTS IN SOIL | 2002 |
|
RU2221918C2 |
Authors
Dates
2016-07-10—Published
2014-11-28—Filed