METHODS AND SYSTEMS FOR MODELLING OF NEURON NETWORKS OF TURBINE COMPONENTS Russian patent published in 2013 - IPC F02C9/00 

Abstract RU 2482307 C2

FIELD: power engineering.

SUBSTANCE: methods to adjust gaps in a turbine include application of at least one working parameter as input data, at least into one model of a neuron network, modelling of thermal expansion by means of the neuron network model for at least one turbine component, and execution of a control action at least partially on the basis of the modelled thermal expansion of one or more turbine components. The system comprises a controller made as capable of determination and application of working parameters as input data into a model of a neuron network, modelling of thermal expansion by means of the neuron network model, and execution of a control action at least partially on the basis of the modelled thermal expansion.

EFFECT: invention makes it possible for provide for higher efficiency of turbine functioning operation.

10 cl, 9 dwg

Similar patents RU2482307C2

Title Year Author Number
MODEL-BASED FURNACE CONTROL MEANS AND FURNACE CONTROL METHOD 2016
  • Tanca Michael Chris
  • Neuschaefer Carl H.
  • Wang Chuan
  • Yang Shizhong
  • Joshi Abhinaya
  • Lou Xinsheng
RU2706080C2
OPTIMISED INTEGRATED CONTROL FOR OXY-FUEL COMBUSTION POWER PLANT 2011
  • Lou Sin'Shehn
RU2559416C2
METHOD AND SYSTEM OF MACHINE CONTROL 2017
  • Singh Anurag
  • Di Palma Steven
RU2727839C2
CALCULATION AND/OR ADAPTATION OF MODELS OF MANUFACTURING AND/OR TECHNICAL PROCESSES 2020
  • Koberg Jokhard Leonard
RU2816861C2
METHOD FOR EVALUATING TEMPERATURE OF BLADES IN STEAM TURBINE 1997
  • Santoso Nugrokho Ivan
  • Petshe Tomas
RU2213997C2
SYSTEM AND METHOD FOR STEAM TURBINE PARAMETER TESTING 2013
  • Hannula Scott Victor
  • Watt Duncan George
RU2621422C2
METHOD, DEVICE AND SYSTEM FOR PRODUCTION FACILITIES CONTROL 2020
  • Oyarzun Gonzalez, Jorge Alejandro
  • Schneider, Joachim
  • Smits, Stefan
  • Tischler, Kurt
RU2783937C1
METHOD FOR EVALUATING TECHNICAL CONDITION OF FLAME TUBES OF GAS TURBINE ENGINE 2020
  • Nikolaev Sergej Mikhajlovich
  • Belov Sergej Dmitrievich
  • Uzhinskij Igor Konstantinovich
  • Glotov Artem Vladimirovich
  • Cheremisinov Sergej Vitalevich
  • Babarin Oleg Olegovich
RU2757532C1
ADVANCED CHANGE OF PRESET PRESSURE TO DISCHARGE FLOW DURING DRILLING OPERATIONS 2011
  • Lovorn Dzhejms R.
  • Devis Nensi S.
RU2586148C2
DEVICE AND METHOD FOR FORECASTING AND OPTIMIZATION OF GAS TURBINE SERVICE LIFE 2012
  • De Prosperis Roberto
  • De Sisto Paolo
  • Borkowski Maciej
RU2617720C2

RU 2 482 307 C2

Authors

Minto Karl Din

Chzhan Tszjan'Bo

Karaka Ehrkhan

Dates

2013-05-20Published

2008-12-30Filed