DEVICE AND METHOD FOR FORECASTING AND OPTIMIZATION OF GAS TURBINE SERVICE LIFE Russian patent published in 2017 - IPC G05B23/02 

Abstract RU 2617720 C2

FIELD: process engineering.

SUBSTANCE: group of inventions relates to forecasting and optimization of the service life of a gas turbine. For this purpose a device and a method for determining estimated remaining life service of a gas turbine rotor are proposed, comprising gas turbine control and obtaining the operation conditions of the gas turbine on the computer; checking the gas turbine rotor and obtaining the check result of the gas turbine rotor; updating the database for the turbine park of the gas turbines class, having a common set of characteristics corresponding to a given gas turbine, based on operating conditions of the gas turbine rotor and the check result of the gas turbine rotor; and calculating the estimated remaining service life of the gas turbine rotor and the associated risk of extending the service life, while the calculating pitch also comprises: measuring the independent variables of the gas turbine; and the use of physical models of the gas turbine based on the plurality of the independent variables.

EFFECT: invention provides increased accuracy in determining the service life of the gas turbine.

10 cl, 6 dwg

Similar patents RU2617720C2

Title Year Author Number
INCREASED SERVICE LIFE OF POWER TURBINE DISK SUBJECTED TO CORROSION DAMAGE DURING OPERATION (EMBODIMENTS) 2018
  • Dua, Dipankar
  • Whiddon, Johnny
  • Khajavi, Mohammad Reza
  • Foley, Jason
RU2737127C1
METHOD TO MEASURE GEOMETRIC DEFORMATIONS OF TURBINE COMPONENT 2013
  • Slovik Slavomir
  • Tsharner Tomas
  • Bednarzh Petr
  • Prugarevich Mikhail Tomash
RU2562327C2
PREDICTION OF AIRCRAFT ENGINE MAINTENANCE OPERATIONS 2012
  • Dele Gijom
  • Ote Zhan-Filipp
  • Zhandronno Erik
RU2611239C2
SURGE IN THE GAS COMPRESSOR PREDICTING METHOD 2016
  • Krishnababu Sentkhil
RU2678155C1
COMPUTER-IMPLEMENTED METHOD FOR ESTIMATING THE SERVICE LIFE OF A CRACKED PART AND A SYSTEM FOR ESTIMATING THE SERVICE LIFE OF A PART 2017
  • De Mura Pino, Raul Fernando
  • Soria, Dide Zhoze Diego
RU2748411C2
BALANCE CONTROLLER IN THE PUMP STOCK DURING FRACTURING OPERATIONS 2019
  • Mu, Nan
  • Kuhn De Chizelle, Yan P.
  • Binet, Florence
  • Lee, Manbro
  • Taylor, Alexander Tanner
  • Suharik, Bryan
  • Schoene, Clare
  • Matthews, James
  • Mi, Bao
  • Anchlia, Muktabh
RU2776144C1
METHOD AND SYSTEM OF ACCOUNTING RESIDUAL OPERATION LIFE OF TURBO-AGGREGATE COMPONENTS 2017
  • Klimenko Oleg Grigorevich
  • Krymskij Aleksandr Vasilevich
  • Lifshits Mikhail Valerevich
RU2668852C1
CONTROLLING FRACTURING OPERATIONS 2019
  • Mu, Nan
  • Weng, Xiaowei
  • Lesko, Timothy Michael
  • Matthews, James
  • Kajita, Marcos Suguru
  • Mi, Bao
  • Bagulayan, Amal
  • Daube, Francois
  • Hobbs, Brandon Travis
  • Kuhn De Chizelle, Yan P.
  • Menasria, Samir
  • Ho, Kevin
RU2776140C1
METHOD FOR EVALUATION OF RESIDUAL LIFE OF HYDRAULIC TURBINE IMPELLER AT BEYOND DESIGN BASIS OF OPERATION 2019
  • Georgievskaya Evgeniya Viktorovna
  • Georgievskij Nikolaj Vladimirovich
RU2721514C1
METHOD FOR EXTENDING THE OPERATING LIFE OF AMUSEMENT RIDES 2020
  • Lapaev Artem Valerevich
  • Lapaev Valerii Petrovich
RU2756827C1

RU 2 617 720 C2

Authors

De Prosperis Roberto

De Sisto Paolo

Borkowski Maciej

Dates

2017-04-26Published

2012-07-25Filed