FIELD: construction.
SUBSTANCE: structure of a marine installation comprises a body adapted for placement at least partially around the primary structure of the marine installation, at least one ledge installed around the outer surface of the body and having the first end designed for ice breaking. The support system placed on the body and adapted for insulation of the body from the primary structure so that the body may absorb at least some vibrations caused by icing.
EFFECT: provision of protection against vibrations caused by icing, reduced material intensity, reduced wave load at a protective structure.
25 cl, 9 dwg
Title | Year | Author | Number |
---|---|---|---|
MOBILE ARCTIC DRILLING SYSTEM OF YEAR-ROUND OPERATION | 2007 |
|
RU2422614C2 |
ICE WORTHY JACK-UP DRILLING UNIT WITH PRE-LOADING TENSION SYSTEM | 2011 |
|
RU2583467C2 |
JACK-UP DRILLING OFFSHORE UNIT OF ICE CLASS WITH GAS MIXING AND ICE-REINFORCED SCREENS FOR SUPPORT LEGS | 2011 |
|
RU2573372C2 |
SELF-LIFTING MARINE DRILLING ICE-BREAKING-CLASS PLATFORM WITH ICING RULED OUT BY GAS MIXING | 2011 |
|
RU2571782C2 |
SEMISUBMERSIBLE FLOATING BASE AND OPERATION METHOD THEREOF | 2011 |
|
RU2591780C2 |
METHOD FOR REMOVING ICE FROM THE STAY WIRE (OPTIONS) | 2021 |
|
RU2764653C1 |
JACK-UP DRILLING RIG WITH TWO DERRICKS FOR OPERATION UNDER ICE CONDITIONS | 2011 |
|
RU2555976C2 |
SELF-ELEVATING DRILLING OFFSHORE UNIT OF ICE CLASS WITH SINGLE CONIC PILE-SUPPORTED LEG | 2011 |
|
RU2573301C2 |
SELF-ELEVATING DRILLING OFFSHORE UNIT OF ICE CLASS WITH SINGLE CONIC PILE-SUPPORTED LEG AND ADJUSTING SEATS | 2011 |
|
RU2564711C2 |
IMPROVED SELF-LIFTING DRILLING RIG AND SIMILAR DRILLING PLATFORMS | 2005 |
|
RU2386747C2 |
Authors
Dates
2013-07-27—Published
2008-07-29—Filed