FIELD: oil and gas industry.
SUBSTANCE: method includes simulating of formation and recording of data on borehole processes by a geophysical instrument run-in into the tubing string at a logging cable and self-contained instruments installed at the lower end of the tubing string. At that simulation of formation is made by breaking a breakable drain valve made of a brittle material of hemisphere shape and installed with a convex part downwards in the lower part of the tubing string; for this purpose a drill stem is fixed under the geophysical instrument and the geophysical instrument is run-in with the stem into the interval with speed sufficient to break the breakable drain valve. At that upper part of the tubing sting above the breakable drain valve is not filled with water and a packer is installed in tubular annulus at the level of the tubing string lower part.
EFFECT: increase of information content and reliability for borehole investigations; reduction of labour intensity, time consumption and equipment costs; possibility to use in wells with any producibility of the investigated formation.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SIMULTANEOUS-SEPARATE OPERATION OF DUALLY-COMPLETED WELL AND WELL PUMP UNIT FOR ITS IMPLEMENTATION | 2014 |
|
RU2562641C2 |
METHOD OF OPERATION OF WELL PUMPING UNIT AT WELL COMPLETION AND WELL PUMPING UNIT FOR METHOD EMBODIMENT | 2001 |
|
RU2189504C1 |
PROCESS OF ACCEPTANCE AND EXAMINATION OF WELLS, OF INTENSIFICATION OF OIL AND GAS INFLOWS, OF CONDUCTING WATER- INSULATION WORK AND GEAR FOR IMPLEMENTATION OF PROCESS | 2001 |
|
RU2179631C1 |
WELL JET PLANT FOR SELECTIVE TESTING OF FORMATIONS | 2016 |
|
RU2631580C1 |
UNIT FOR DUAL BED OPERATION IN ONE CHINK | 2009 |
|
RU2387809C1 |
SECONDARY BED DRILLING-IN AT DEPRESSION WITH LOWERING OF PERFORATOR FOR SUBSURFACE PUMP AND DEVICE TO THIS END (VERSIONS) | 2014 |
|
RU2571790C1 |
METHOD OF SELECTIVE HYDRODYNAMIC RESEARCHES IN WELLS AT MULTI-ZONE METHAN COAL DEPOSITS | 2016 |
|
RU2611780C1 |
WELL SWABBING METHOD | 2010 |
|
RU2410532C1 |
OPERATING METHOD OF WELL JET PUMP UNIT DURING HYDRAULIC FRACTURING OF FORMATIONS | 2019 |
|
RU2705708C1 |
METHOD OF OPERATION OF AN INJECTION WELL OF A SMALL DIAMETER WITH A SINGLE LIFT TWO-PACKER ARRANGEMENT | 2017 |
|
RU2678745C1 |
Authors
Dates
2013-08-20—Published
2011-12-12—Filed