FIELD: oil and gas industry.
SUBSTANCE: liner and anchor is lowered to the repair interval; anchor is mounted; liner walls are expanded till they are pressed to the well walls. Works are performed in the well with at least a six-inch worn-out production string; perforation interval of the production string is covered with the liner at least 2 m on each side. Works with the liner are performed in water solution of surface-active substance. A new production string is lowered to the well; inter-tube space is cemented between old and new production strings; the new production string at the productive formation interval, a cement ring between the liner and the new production string, the liner and the old production string is perforated.
EFFECT: improving sealing reliability.
Title | Year | Author | Number |
---|---|---|---|
SEALING METHOD FOR PRODUCTION STRING DISORDERS | 2015 |
|
RU2592309C1 |
EXTRACTED THREADED PATCH DEVICE FOR SEALING PRODUCTION STRING DISORDERS | 2015 |
|
RU2592310C1 |
METHOD FOR ISOLATION OF LEAKAGE INTERVAL OF PRODUCTION STRING OF WELL WITH EXPANDABLE FLY | 2023 |
|
RU2824451C1 |
METHOD OF PRODUCTION STRING SEALING | 2014 |
|
RU2570178C1 |
MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN WELL HORIZONTAL SHAFT | 2014 |
|
RU2547892C1 |
METHOD FOR CASING PIPE REPAIR IN WELL | 2004 |
|
RU2273718C1 |
WELL OPERATION INTENSIFICATION METHOD | 2013 |
|
RU2527917C1 |
METHOD OF DEVELOPMENT AND EXPLORATION OF WELLS AND OF INTENSIFYING OF OIL-GAS INFLUX OF HEAVY HIGH VISCOUS OILS AND FACILITY FOR IMPLEMENTATION OF THIS METHOD | 2007 |
|
RU2340769C1 |
WELL OPERATION INTENSIFICATION METHOD | 2013 |
|
RU2527913C1 |
METHOD FOR FORMATION HYDRAULIC FRACTURING IN HORIZONTAL OPEN WELL SHAFT | 2014 |
|
RU2541693C1 |
Authors
Dates
2013-09-27—Published
2012-10-17—Filed