FIELD: construction.
SUBSTANCE: method to install underground vertical cylindrical reservoirs consisting in digging a pit for a reservoir, installation of a foundation, installation of the reservoir into the foundation and its fixation to the foundation, testing of the mounted reservoir and filling of the space between the reservoir and the pit. Travelling forms are installed on the bottom of the pit on top of the reservoir, and the forms are made in the form of a cylinder without a base with a diameter defined in accordance with the expression d=d + 0.4m, where d - diameter of forms, d - reservoir diameter, m, with elements for gripping and moving of the forms in the upper part. Filling is carried out by layerwise filling of the space between the forms and the reservoir with sand, and between the forms and the pit - with soil with subsequent ramming of each layer. Then repeated filling of the forms is carried out with sand, and the pit is filled with soil, after moving of the forms upwards along the reservoir until full filling of the pit and withdrawal of the forms.
EFFECT: higher cost-effectiveness of installation of underground vertical cylindrical reservoirs, reduced material intensity and labour intensiveness of construction.
3 cl, 1 tbl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
UNDERGROUND TANK METHOD | 2016 |
|
RU2642587C1 |
METHOD FOR BLOCK-MODULAR CONSTRUCTION OF STRUCTURES IN FOUNDATION PITS AND BURIED STRUCTURE FOR MILITARY INFRASTRUCTURE FACILITIES | 2018 |
|
RU2702779C1 |
METHOD OF BLOCK-MODULAR CONSTRUCTION OF STRUCTURES IN PITS | 2023 |
|
RU2811514C1 |
METHOD OF RECULTIVATION OF OBJECTS PROVIDING NEGATIVE EFFECTS ON ENVIRONMENT | 2017 |
|
RU2633397C1 |
SUBWAY STATION ERECTION METHOD (YURKEVICH(S METHOD) | 2014 |
|
RU2565314C2 |
METHOD OF IMPROVING DEVICE FOR IMPERVIOUS PROTECTIVE SCREEN ON MSW LANDFILLS | 2018 |
|
RU2683443C1 |
METHOD FOR ERECTION OF VEHICULAR TRAFFIC TUNNEL OF URBAN RING HIGHWAY OF MEGAPOLIS | 1999 |
|
RU2152473C1 |
METHOD FOR ERECTING INTRA-CITY CIRCULAR MOTORWAY | 1999 |
|
RU2175367C2 |
METHOD FOR CONSTRUCTION OF GAS PIPELINES AND/OR CONDENSED GAS PIPELINES, ENGINEERING EQUIPMENT AND COMPLEX OF OBJECTS FOR PRODUCTION AND TRANSPORTATION OF GAS AND METHOD OF OPERATION AND/OR REPAIR, AND/OR RECONSTRUCTION, AND/OR REBUILDING OF GAS PIPELINES AND/OR CONDENSED GAS PIPELINES AND ENGINEERING EQUIPMENT | 1995 |
|
RU2053432C1 |
METHOD FOR ERECTION OF URBAN RING HIGHWAY SECTION MEGAPOLIS | 1999 |
|
RU2152470C1 |
Authors
Dates
2013-10-10—Published
2012-03-11—Filed