FIELD: construction.
SUBSTANCE: method consists in digging a pit for the tank, installing the foundation, installing the tank in the pit and attaching it to the foundation, testing the mounted tank, placing it on the bottom of the pit bottom around the tank of the prefabricated movable formwork equipped with elements for capturing and moving the formwork in the upper part and filling the space between the tank and the pit. The formwork is prefabricated, it is made of a set of side and end elements, and the filling is carried out by layer filling of the space between the formwork and the tank - with sand, and between the formwork and the pit - with soil, followed by ramming of each layer. Then, the formwork is refilled with sand and the pit is refilled with soil after the formwork is moved upwards, along the tank until the pit is fully filled and the formwork is removed.
EFFECT: increasing the economical efficiency of the tank installation due to the use of prefabricated formwork, reducing labour intensity, reducing the sand consumption.
4 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO INSTALL UNDERGROUND VERTICAL CYLINDRICAL RESERVOIRS | 2012 |
|
RU2495196C1 |
METHOD FOR BLOCK-MODULAR CONSTRUCTION OF STRUCTURES IN FOUNDATION PITS AND BURIED STRUCTURE FOR MILITARY INFRASTRUCTURE FACILITIES | 2018 |
|
RU2702779C1 |
METHOD OF RECULTIVATION OF OBJECTS PROVIDING NEGATIVE EFFECTS ON ENVIRONMENT | 2017 |
|
RU2633397C1 |
METHOD OF BLOCK-MODULAR CONSTRUCTION OF STRUCTURES IN PITS | 2023 |
|
RU2811514C1 |
METHOD FOR STRUCTURE CONSTRUCTION IN THE UNDER-RUNNER SPACE OF RIVERS AND CANALS IN URBAN DEVELOPMENT | 2021 |
|
RU2770187C1 |
METHOD OF MAKING FOUNDATION PIT | 0 |
|
SU1559049A1 |
METHOD FOR CONSTRUCTING PITS | 0 |
|
SU1794192A3 |
METHOD FOR CONSTRUCTION OF GAS PIPELINES AND/OR CONDENSED GAS PIPELINES, ENGINEERING EQUIPMENT AND COMPLEX OF OBJECTS FOR PRODUCTION AND TRANSPORTATION OF GAS AND METHOD OF OPERATION AND/OR REPAIR, AND/OR RECONSTRUCTION, AND/OR REBUILDING OF GAS PIPELINES AND/OR CONDENSED GAS PIPELINES AND ENGINEERING EQUIPMENT | 1995 |
|
RU2053432C1 |
SINGLE-VAULT MULTILEVEL SUBWAY STATION AND METHOD OF ITS CONSTRUCTION (P.B. YURKEVICH'S DESIGN) | 2014 |
|
RU2562359C2 |
METHOD FOR ERECTION OF VEHICULAR TRAFFIC TUNNEL OF URBAN RING HIGHWAY OF MEGAPOLIS | 1999 |
|
RU2152473C1 |
Authors
Dates
2018-01-25—Published
2016-09-12—Filed