SYSTEMS, ASSEMBLIES AND METHODS FOR CONTROL OF TOOLS IN WELL BORE Russian patent published in 2013 - IPC E21B23/08 

Abstract RU 2495221 C2

FIELD: mining.

SUBSTANCE: system comprises a separate hydraulic line for transfer of a signal device, capable of generation of one or several individual signals to one or more tools in an underground well. Each tool may be equipped with a reading device to receive signals from the signal device and to send signals to the signal device. Each reading device may control action of a tool connected to with it, if the reading device is programmed to react to signals received from the control device. The working liquid of the hydraulic system used for control of tool action may move along the separate hydraulic line or an individual hydraulic line. The individual hydraulic line may be used to return the tool into the initial position. At the same time the control line have a channel with a diameter sufficient for displacement of the signal device through it, but insufficient for provision of commercial quantities of produced fluid media.

EFFECT: increased efficiency of tools control in a well bore.

44 cl, 10 dwg

Similar patents RU2495221C2

Title Year Author Number
HYDRAULIC FRACTURING METHOD 2009
  • Snajder, Filip M.
  • Perkis, Daniel G.
RU2535868C1
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION 2015
  • Tolman, Randy, C.
  • Morrow, Timothy, I
  • Benish, Timothy, G.
RU2658400C1
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION 2015
  • Tolman Rendi K.
  • Morrou Timoti I.
  • Benish Timoti G.
RU2664989C1
PROCEDURE AND DEVICE FOR INTRAWELL SELECTIVE COMMUNICATION BY MEANS OF FLUID MEDIUM 2007
  • Vesson Dehvid S.
  • Dzhordzh Kevin R.
  • Snajder Filip M.
RU2401936C1
MULTI-ZONE COMPLETION WITH FORMATION HYDRAULIC FRACTURING 2012
  • Rejvensbergen Dzhon Edvard
  • Lon Lajl Ervin
  • Misselbruk Dzhon Dzh.
RU2601641C2
ASSEMBLY AND METHOD FOR FLOW INTENSIFICATION BY HYDRAULIC FRACTURING IN SEVERAL ZONES USING INDEPENDENT UNITS IN PIPE SYSTEMS 2011
  • Tolman Rehndi K.
  • Ehntchev Pavlin B.
  • Ankheles Bosa Renso M.
  • Petri Dennis Kh.
  • Sirls Kevin Kh.
  • Ehl'-Rabaa Abdel' Vadud Mokhammed
RU2571460C2
MECHANISM FOR ACTIVATION OF MULTIPLE BOREHOLE DEVICES 2011
  • Chen Kuo-Chian
  • Tasiro Khitosi
  • Kuper Ajan
  • Pejbon Dzheir
  • Okalan Murat
RU2524219C1
PROCEDURE FOR COMPLETION WITH HYDRO-FRAC IN MULTITUDE OF PRODUCING INTERVALS (VERSIONS) 2008
  • Ist Lojd Eh. Ml.
RU2412347C1
WELL MANAGEMENT SYSTEM FOR HYDROCARBON PRODUCTION 2021
  • Tyutikov Sergej Ivanovich
  • Rabovskij Anton Nikolaevich
RU2779680C1
METHOD AND SYSTEM OF FORMATION HYDRAULIC FRACTURING 2012
  • Richard Bennett M.
  • Sjuj Jan
RU2604600C2

RU 2 495 221 C2

Authors

Snajder Filip M.

Perkis Daniel G.

Dates

2013-10-10Published

2009-03-04Filed