FIELD: construction.
SUBSTANCE: roof with slopes and with a drain comprises upper and lower decks, at the same time the sheet of the upper deck is made from a gutter to a gutter being shaped as closing the space between the drain gutter on the sheet of the lower deck and the eave edge. The sheet of the upper deck is fixed without a gap above the rib of the drain gutter and is fixed with the sheet of the lower deck in the area of the eave edge with a gap between the sheets.
EFFECT: prevention of ice formation on a roof in those areas that are dangerous because of ice crust pieces falling off a roof, and in those areas where ice crust formation is possible, facilities are provided for its controlled removal with a mechanised method.
8 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE TO REMOVE SNOW AND ICE | 2012 |
|
RU2502854C1 |
ANTI-ICING ROOFING OF SLOPING OR CONDITIONALLY FLAT ROOFS, RECONSTRUCTION METHOD FOR EXISTENT OUTER ORGANIZED WATER DRAINAGE SYSTEM, WHICH DRAINS WATER, PREFERABLY WATER FROM MELTED SNOW, FROM INCLINED METAL ROOFING, AND ANTI-ICING WALL GUTTER FOR ABOVE RECONSTRUCTION REALIZATION | 2005 |
|
RU2301869C2 |
BUILDING WITH PITCHED ROOF HAVING DEVICE FOR PREVENTION OF FORMATION OF ICICLES, ICE CRUST AND SNOW CORNICES ON ROOF | 2011 |
|
RU2481443C1 |
DEVICE FOR REMOVAL OF SNOW AND ICE FROM ROOF LARMIER | 2009 |
|
RU2392398C1 |
EXTERNAL DRAINAGE SYSTEM FROM THE ROOFING OF THE BUILDING | 2015 |
|
RU2667559C2 |
ROOFING WITH MEANS TO PREVENT THE FORMATION OF ICE AND ICICLES | 2021 |
|
RU2779365C1 |
DEVICE TO REMOVE ICE AND SNOW FROM ROOF | 2013 |
|
RU2532048C1 |
ARRANGEMENT OF BUILDING AND STRUCTURE ROOF | 2012 |
|
RU2494199C1 |
ARANGEMENT OF BUILDING AND STRUCTURE ROOF | 2007 |
|
RU2338853C1 |
ROOF CORNICE | 0 |
|
SU953143A1 |
Authors
Dates
2013-10-20—Published
2012-02-13—Filed