FIELD: mining.
SUBSTANCE: proposed method comprises preparation of the field of cleaning operations by construction of working site over the direction of strata at the face of mine edge with cutting of outcropping bed, installation of working equipment at said site, that is, a drilling rid and water pump column, production of flat seams from mine bottom point and mine roadways over every seam crossed by cross-cut, and excavation of coal aside from working site by jetting.
EFFECT: higher efficiency.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OPEN-UNDERGROUND DEVELOPMENT OF STEEPLY PITCHING COAL | 2017 |
|
RU2648133C1 |
METHOD FOR COMPLEX DEVELOPMENT OF COAL DEPOSIT | 2012 |
|
RU2513785C1 |
METHOD OF OPEN AND UNDERGROUND MINING OF SERIES OF SEMI-STEEP COAL LAYERS | 2014 |
|
RU2563895C1 |
COMBINED METHOD FOR MINING OF COAL SEAMSERIES | 1992 |
|
RU2039257C1 |
METHOD FOR OPEN-UNDERGROUND MINING OF THICK STEEP COAL BED | 2012 |
|
RU2490454C1 |
COMBINED METHOD OF MINING OF FORMATION OF STEEPLY DIPPING COAL SEAMS | 1996 |
|
RU2099524C1 |
METHOD FOR OPEN-UNDERGROUND MINING OF HEAVY SLOPE COAL BED | 2011 |
|
RU2487240C1 |
METHOD FOR OPEN-UNDERGROUND MINING OF THICK FLAT COAL BED | 2011 |
|
RU2490456C1 |
DEVELOPMENT METHOD OF STEEP COAL BEDS | 2013 |
|
RU2540722C1 |
METHOD FOR MINING COAL SEAMS FROM THE SIDES OF COAL MINES USING UNDERGROUND COAL MINING TECHNOLOGIES | 2021 |
|
RU2777214C1 |
Authors
Dates
2013-11-20—Published
2012-05-23—Filed