FIELD: machine building.
SUBSTANCE: oil pipeline is shut off before pump, filling and discharge pipelines are drained by water filling through the pump cavity above the level of drain valves. Then in filling pipeline there drilled is one hole for plugs on the level of drain valve, and the other hole is drilled 80-100 mm higher. Head piece is inserted in each hole, through the lower piece head water is supplied by flexible hoses, and through the upper piece head water is drained with oil components to tanks of emergency leaks gathering, thus forming a hydraulic lock before the pump. The pump is dismantled and a new pump is mounted, hot works are performed, then oil pressure test is conducted under operating pressure and oil pipeline is put into operation.
EFFECT: possibility to reduce labour intensity and duration of works on pump replacement excluding adverse effect of clay plugs use.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF REPAIRING PIPELINES | 2002 |
|
RU2241170C2 |
OIL STORAGE SYSTEM | 2003 |
|
RU2215676C1 |
PIPELINE SHUT-OFF DEVICE | 2008 |
|
RU2376521C1 |
METHOD OF DEVELOPING OIL DEPOSITS AND BLOCK COMPLEX SYSTEM OF PLANTS FOR METHOD EMBODIMENT | 1999 |
|
RU2189439C2 |
METHOD OF PREPARING MAIN LINE FOR REPAIR AND DEVICE TO THIS END | 2010 |
|
RU2460927C2 |
SYSTEM AND METHOD FOR RESTORING WELL PRODUCTIVENESS AND EXTRACTION OF OIL BY PUMP METHOD, INCLUDING CASE AFTER STOPPING | 2003 |
|
RU2238400C1 |
METHOD FOR PERFORMING FIRE FIGHTING EMERGENCY AND REPAIR OPERATIONS ON PETROLEUM PRODUCT PIPELINES | 0 |
|
SU1743614A1 |
METHOD OF REPAIR WITH REPLACEMENT OF DAMAGED PIPES ON MAIN LINES OF LIQUID HYDROCARBONS USING ELASTIC IN-PIPE SEALERS | 2019 |
|
RU2698172C1 |
DEVICE TO PREVENT OIL SPILLAGE FROM EMERGENCY UNDERWATER OIL PIPELINE | 2011 |
|
RU2470113C1 |
METHOD OF PREVENTING OIL SUPPLY TO THE MAIN PIPELINE, WHICH DOES NOT CORRESPOND TO THE STANDARDIZED QUALITY INDICATORS | 2019 |
|
RU2713310C1 |
Authors
Dates
2013-11-27—Published
2012-10-09—Filed