FIELD: oil industry.
SUBSTANCE: invention relates to production of hydrocarbons and can be used during underground repair of wells equipped with flush lift, electric centrifugal or other pumps. Method includes using a through packer installation with an anchor mechanism. Apparatus includes emergency disconnection device, a valve unit with a seat for ball and mechanism to prevent ejection of ball into space above packer. There are units for telemetry and release of balls directly attached to lower part of electric submersible pump. Based on instruction from mouth, ball is released and excess pressure is used to install said ball in seat of valve assembly. Communication with productive formation is performed by generation of excess pressure in packer space and squeezing of ball on bottom hole.
EFFECT: technical result is improved efficiency of procedure due to possibility of lifting of well pump for repair and carrying out preventive operations without impact on bed.
1 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR UNDERGROUND WELL REPAIR TO REPLACE SUBMERSIBLE EQUIPMENT AND EXCLUDE INFLUENCE OF WELL-KILLING FLUID ON PRODUCTIVE PLAST | 2016 |
|
RU2623750C1 |
FORMATION CUT-OFF PROCEDURE FOR WORK OVER WITHOUT WELL KILL OPERATION | 2013 |
|
RU2531011C1 |
DEPLETED WELL OPERATION PLANT | 2016 |
|
RU2622412C1 |
UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF FORMATIONS | 2018 |
|
RU2724084C2 |
PUMP PACKER ASSEMBLY FOR DUAL PUMPING OF TWO BEDS | 2012 |
|
RU2493359C1 |
METHOD OF SIMULTANEOUS SEPARATE OR SEQUENTIAL PRODUCTION OF FORMATION FLUID IN WELLS OF MULTILAYER FIELDS WITH USE OF DOWNHOLE DISCONNECTABLE WET CONTACT UNIT | 2011 |
|
RU2500882C9 |
DOWN-HOLE TESTING AND MEASURING COMPLEX AND METHOD FOR ITS INSTALLATION IN HORIZONTAL WELL | 2012 |
|
RU2487238C1 |
DOWHNOLE PUMP UNIT FOR SIMULTANEOUS AND SEPARATE OPERATION OF TWO FORMATIONS | 2012 |
|
RU2488689C1 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTIPLE-ZONE WELL BY TWO SUBMERSIBLE PUMPS AND EQUIPMENT FOR ITS IMPLEMENTATION | 2012 |
|
RU2515630C1 |
METHOD OF SIMULTANEOUS SEPARATE OR SUCCESSIVE PRODUCTION OF RESERVOIR FLUID FROM WELL OF MULTIPAY FIELDS WITH PRELIMINARY INSTALLATION OF PACKERS | 2014 |
|
RU2552555C1 |
Authors
Dates
2016-07-27—Published
2015-08-28—Filed