FIELD: oil and gas industry.
SUBSTANCE: invention relates to submersible pumping units for operation of wells, where it is necessary to increase the differential pressure drawdown, without deepening of submersible pumping unit, and/or with unsealed production casing. The unit for oil-well operation includes the tubing string, electric submersible cable, electric submersible pump, the hydroprotection and submersible electric motor of which are encapsulated in the pressure-tight housing, which is tightly closed on the housing of the input unit of the electric submersible pump, the liner consisting from the pipe string the top part of which through the bushing is tightly connected to the bottom part of the pressure-tight housing, and in the bottom part of the liner the branch pipe with external sealing elements is located. The unit contains at least one packer with internal through passage channel with the diameter allowing to pass through the packer the tool, equipment and instruments, without extracting the packer. The sealing unit for the tight connection with the branch pipe of the liner is located either in the packer housing, or in the device below or above the packer.
EFFECT: improvement of performance of recovery of formation fluid from the wells.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPMENT AND OPERATION OF WELLS | 2018 |
|
RU2691423C1 |
METHOD OF APPLICATION OF ELECTRICAL CENTRIFUGAL PUMP WITH MULTIPHASE PUMP AND PACKER | 2015 |
|
RU2620667C1 |
METHOD OF SIMULTANEOUS SEPARATE OR SUCCESSIVE PRODUCTION OF RESERVOIR FLUID FROM WELL OF MULTIPAY FIELDS WITH PRELIMINARY INSTALLATION OF PACKERS | 2014 |
|
RU2552555C1 |
METHOD OF SIMULTANEOUS SEPARATE OR SEQUENTIAL PRODUCTION OF FORMATION FLUID IN WELLS OF MULTILAYER FIELDS WITH USE OF DOWNHOLE DISCONNECTABLE WET CONTACT UNIT | 2011 |
|
RU2500882C9 |
FORMATION CUT-OFF PROCEDURE FOR WORK OVER WITHOUT WELL KILL OPERATION | 2013 |
|
RU2531011C1 |
PUMP UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF TWO FORMATIONS | 2019 |
|
RU2722174C1 |
BOREHOLE PUMP UNIT FOR SIMULTANEOUS OPERATION OF TWO BEDS WITH GAS BYPASS FROM UNDER PARKER SPACE (VERSIONS) | 2011 |
|
RU2464413C1 |
PUMP UNIT FOR SIMULTANEOUS-SEPARATE OPERATION OF TWO WELL FORMATIONS | 2018 |
|
RU2699502C1 |
PUMP UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF TWO FORMATIONS IN WELL | 2011 |
|
RU2469181C1 |
PRODUCING RESERVOIRS SURVEY METHOD AT DUAL OPERATION OF MULTI-PAY WELL AND INSTALLATION FOR ITS IMPLEMENTATION | 2014 |
|
RU2546218C1 |
Authors
Dates
2015-01-10—Published
2013-04-17—Filed