FIELD: oil and gas industry.
SUBSTANCE: when an electric submersible pump is extracted from a wel, activation of the shut-off valve's locking group is performed when wellhead is sealed by an electric drive, fixed directly in the bottom of the electric submersible pump, a pusher actuated by a wellhead command via the submersible pump power cable, which is simultaneously a power source, in which the opening or closing of the shut-off valve is performed without moving the electric submersible pump. Underground repair without impact on the plast is performed by closing the valve unit of the push action by moving the rod upwards, moving the rod downwards while creating a certain force on the valve allows to open a connection with a sub-packer space, a productive plust. The pushing mechanism is a continuation of the telemetric system of the electric submersible equipment and depends on the state of insulation of the power cable and the submersible electric motor.
EFFECT: in cases of insulation failure in the pushing mechanism, accumulator batteries are provided, allowing to transfer the rod to the transport position where the valve unit is closed.
2 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR UNDERGROUND WELL REPAIR FOR REPLACEMENT OF DOWNHOLE PUMPING EQUIPMENT WITHOUT ACTION ON FORMATION | 2015 |
|
RU2592903C1 |
FORMATION CUT-OFF PROCEDURE FOR WORK OVER WITHOUT WELL KILL OPERATION | 2013 |
|
RU2531011C1 |
DEPLETED WELL OPERATION PLANT | 2016 |
|
RU2622412C1 |
UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF FORMATIONS | 2018 |
|
RU2724084C2 |
PUMP PACKER ASSEMBLY FOR DUAL PUMPING OF TWO BEDS | 2012 |
|
RU2493359C1 |
METHOD OF SIMULTANEOUS SEPARATE OR SEQUENTIAL PRODUCTION OF FORMATION FLUID IN WELLS OF MULTILAYER FIELDS WITH USE OF DOWNHOLE DISCONNECTABLE WET CONTACT UNIT | 2011 |
|
RU2500882C9 |
DOWHNOLE PUMP UNIT FOR SIMULTANEOUS AND SEPARATE OPERATION OF TWO FORMATIONS | 2012 |
|
RU2488689C1 |
BOREHOLE PUMP UNIT FOR SIMULTANEOUS OPERATION OF TWO BEDS WITH GAS BYPASS FROM UNDER PARKER SPACE (VERSIONS) | 2011 |
|
RU2464413C1 |
DOWN-HOLE TESTING AND MEASURING COMPLEX AND METHOD FOR ITS INSTALLATION IN HORIZONTAL WELL | 2012 |
|
RU2487238C1 |
PROCEDURE FOR INSULATING PERMEABLE SECTION OF PRODUCTION STRING OR PERFORATED INTERVAL OF IDLE FORMATION OF WELL (VERSIONS) | 2008 |
|
RU2383713C1 |
Authors
Dates
2017-06-29—Published
2016-10-14—Filed