FIELD: construction.
SUBSTANCE: method includes submersion of a pipe into soil with an open end, formation of a soil core in it and its removal from the pipe with the supplied fluid medium by means of breaking and squeezing out in parts. The fluid medium is supplied into the soil core at the outer side of the submerged pipe, using the channel of connection between the pipeline for supply of the fluid medium and the inner cavity of the submerged pipe.
EFFECT: increased efficiency due to reliability of soil core removal by means of creation of conditions to preserve integrity of a broken part of the soil core.
5 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR TRENCHLESS LAYING OF PIPELINE IN GROUND AND DEVICE FOR ITS REALIZATION | 1996 |
|
RU2116405C1 |
METHOD OF PIPE DRIVING IN SOIL | 2012 |
|
RU2516630C1 |
APPARATUS FOR TRENCHLESS LAYING OF PIPELINES | 0 |
|
SU1051184A1 |
METHOD AND DEVICE FOR TRENCHLESS LAYING OF UNDERGROUND SERVICE LINES | 2000 |
|
RU2184191C1 |
PROCESS OF FORMATION OF HORIZONTAL HOLES | 1998 |
|
RU2156847C2 |
APPARATUS FOR TRENCHLESS LAYING OF PIPES BY PRESSING-THROUGH | 0 |
|
SU846667A1 |
METHOD OF LAYING PIPES AND A PIPE FOR ITS IMPLEMENTATION | 2015 |
|
RU2594497C1 |
METHOD FOR REMOVING SOIL CORE FROM PIPE AND DEVICE FOR ITS IMPLEMENTATION | 2009 |
|
RU2399725C1 |
METHOD FOR TRENCHLESS LAYING PIPELINES | 1991 |
|
RU2047697C1 |
METHOD OF AND DEVICE FOR TRENCHLESS LAYING OF SERVICE LINES | 1997 |
|
RU2134747C1 |
Authors
Dates
2013-12-20—Published
2012-05-04—Filed