FIELD: construction.
SUBSTANCE: hole for output of rubber-cord sealer pneumatic pipeline is drilled on the wall of repaired section of the pipeline. Rubber-cord sealer is installed in inner cavity of the pipeline with pneumatic pipeline being output. Rubber-cord sealer shell is filled with operating gas, nitrogen or air for instance, to operating pressure. Then gas operating pressure is increased up to value of 1.25 from operating pressure, and increased pressure is maintained for at least 15 minutes with subsequent pressure reduction to operating pressure. Repair works are performed maintaining operating pressure of operating gas during the whole period of repair works. Then pressure in rubber-cord sealer shell is dropped to atmospheric pressure, pneumatic pipeline is removed from the hole, the hole is plugged, rubber-cord sealer is removed.
EFFECT: simplifying execution of repair works on pipeline and providing high level of repair works safety.
3 cl
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR TIGHT CLOSURE OF INTERNAL CAVITY OF OIL PRODUCT PIPELINE OR OIL PIPELINE | 2018 |
|
RU2730132C2 |
METHOD OF REPAIR WITH REPLACEMENT OF DAMAGED PIPES ON MAIN LINES OF LIQUID HYDROCARBONS USING ELASTIC IN-PIPE SEALERS | 2019 |
|
RU2698172C1 |
DEVICE FOR SEALING SPACE OF MAIN PIPELINE | 2006 |
|
RU2315224C1 |
DEVICE FOR OPENED PIPELINE END INTERIOR RESEALING | 2002 |
|
RU2240466C2 |
METHOD OF REPLACING DEFECTIVE SECTION OF MAIN LINE | 2002 |
|
RU2249142C2 |
PIPELINE SHUT-OFF DEVICE | 2008 |
|
RU2376521C1 |
SHUT-OFF DEVICE | 1999 |
|
RU2174206C2 |
METHOD OF REPAIRING OIL PIPELINE USING TEMPORARY OVERLAP | 2015 |
|
RU2604981C1 |
CRUDE OIL PIPELINE PRESSURIZER | 2016 |
|
RU2627994C1 |
DEVICE FOR FIXING A STOPPER IN A GAS PIPELINE | 2023 |
|
RU2801410C1 |
Authors
Dates
2014-02-27—Published
2012-12-26—Filed