FIELD: instrumentation.
SUBSTANCE: at least two state pickups are installed in sewer controlled length zone. Then, readings of pickups are taken and compared with preset thresholds. Said comparison allows decision on sewer length state. Gas analyser is used as state pickup. Note here that all said pickups are arranged at appropriate ends of controlled sewer length and connected with control and data processing unit located outside said sewer controlled length zone. Hence, configured is the measuring complex for control over sewer inner surface corrosion development.
EFFECT: simplified, precise and continuous control process.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
MOBILE COMPLEX FOR DIAGNOSIS OF EMERGENCY TECHNICAL CONDITION OF SECTIONS OF CONCRETE SEWER PIPELINE | 2012 |
|
RU2538159C2 |
SEWAGE PIT (VERSIONS) | 2008 |
|
RU2394965C1 |
AIR CUSHION REGULATION ASSEMBLY IN SECTIONS OF THE SEWER NETWORK OF THE DUCER TYPE | 2021 |
|
RU2770881C1 |
SEWERAGE SIPHON | 1995 |
|
RU2101425C1 |
SEWERAGE RETURN SIPHON | 1995 |
|
RU2107782C1 |
SEWAGE TUBULAR OVERFALL | 0 |
|
SU1038427A1 |
METHOD TO ASSESS AND FORECAST TECHNICAL CONDITION OF REINFORCED CONCRETE HEADERS OF ENGINEERING UTILITIES | 2010 |
|
RU2420630C1 |
METHOD OF PRE-EMERGENCY, EMERGENCY AND POST-ACCIDENT CONTROL OF RADIATION, CHEMICAL AND EXPLOSION SAFETY HAZARD SOURCES IN SEALED MANNED OBJECTS, MAINLY SUBMARINES, AND COMPLEX SYSTEM FOR ITS IMPLEMENTATION | 2015 |
|
RU2596063C1 |
SYSTEM FOR CONTROL OF PARAMETERS OF INERT GAS MEDIUM | 2022 |
|
RU2798453C1 |
MULTISTAGE CANALIZATION DROP STRUCTURE | 0 |
|
SU1574745A1 |
Authors
Dates
2014-02-27—Published
2012-04-05—Filed