FIELD: construction.
SUBSTANCE: monolithic system of a base with a resistant composite coating from homopolymer having semi-continuous configuration comprises load-distributing elements for formation of seams. Comprises a base that includes blocks from polystyrene foam and a bearing semi-continuous cement-concrete coating, the formwork for which is formed by blocks from polystyrene foam that are part of the base. Load-distributing elements are made in the form of load-distributing plates. Each of load-distributing plates comprises two anchors with two reinforcement bars for setting the position of the seam shaper and a hinged joint made as capable of counterclockwise rotation under action of a support moment, developed by the load, and clockwise rotation under action of the support moment developed by load-distributing plates.
EFFECT: efficient operation of a base under action of various loads, reduced material intensity and labour intensiveness.
6 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
REINFORCED-GROUND BARRETTE SHALLOW FOUNDATION | 2016 |
|
RU2633626C1 |
METHOD OF CONSTRUCTION OF BUILDINGS | 2023 |
|
RU2812973C1 |
METHOD OF BUILDING PREFABRICATED ROAD AND AERODROME PAVEMENTS FROM PRESTRESSED REINFORCED CONCRETE SLABS | 2021 |
|
RU2767640C1 |
WATERPROOFING DOWEL | 2021 |
|
RU2757514C1 |
ROAD PAD WITH COMPOSITE PAVEMENT | 2022 |
|
RU2790607C1 |
METHOD FOR SEALING TEMPERATURE AND TEMPERATURE-SETTLING SEAM OF HYDRAULIC STRUCTURE | 1993 |
|
RU2061140C1 |
TAKE-OFF AND LANDING SITE AND METHOD FOR CONSTRUCTION THEREOF | 2017 |
|
RU2709582C2 |
MOTORWAY PAVING | 0 |
|
SU1310468A1 |
METHOD FOR USE OF MEGALOPOLIS HIGHWAY | 1998 |
|
RU2140479C1 |
MOTOR ROAD AND METHOD OF ITS OPERATION TOGETHER WITH REPAIR AND RECONSTRUCTION | 1998 |
|
RU2135671C1 |
Authors
Dates
2014-03-20—Published
2009-07-03—Filed