FIELD: mining.
SUBSTANCE: method includes treatment of coal extracted from coal deposits for opening of its splices with rock. At the same time the coal is placed in layers at the intermediate storage, arranged on the southern slope of a knoll (mountain, hill) or a pit heap, the site of which has an angle of inclination 10-25°, exposed in spring-autumn periods to solar radiation with the number of "thawing-freezing" cycles with transition of temperature via 0°C equal to at least 7. Besides, the thickness of the coal layers is taken on the basis of the calculation sufficient for daily heating-cooling, and after thermal processing the coal is shipped from the warehouse for subsequent demineralisation.
EFFECT: increased opening of coal splices with rock.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
CULTIVATION METHOD OF VEGETABLE AND OTHER TILLED CROPS | 2005 |
|
RU2343661C2 |
METHOD OF DIAMOND RECOVERY FROM ORES | 2002 |
|
RU2213622C1 |
METHOD OF PREPARING BLOCKS OF ACTIVE CLIMATIC ACTION FOR EXCAVATION | 2017 |
|
RU2678254C2 |
0 |
|
SU1565361A1 | |
PROCEDURE OF FORMING AND PREPARING OF EXTERNAL DUMPS AND BORROW CUTS FOR BIOLOGICAL RE-CULTIVATION | 2007 |
|
RU2359127C2 |
METHOD OF CULTIVATING AMARANTH IN IRRIGATED AGRICULTURE | 1999 |
|
RU2159029C1 |
METHOD FOR RECLAMATION OF THE WASTE DUMP | 2021 |
|
RU2763561C1 |
METHOD FOR CONTROLLED SOIL HYDROMELIORATION IN AGRICULTURAL LANDSCAPE IN HUMID CLIMATE WITH INTENSIVE FARMING | 2020 |
|
RU2761875C1 |
METHOD FOR RECLAMATION OF A ROCKY RECTANGULAR DUMP | 2023 |
|
RU2803790C1 |
METHOD FOR RECLAMATION OF A ROCKY ELLIPTICAL DUMP | 2023 |
|
RU2803791C1 |
Authors
Dates
2014-04-27—Published
2012-12-19—Filed