FIELD: machine building.
SUBSTANCE: method for adjusting a valve set in a steam line fitted by a water injection device involves stages when actual
EFFECT: ensuring the valve adjustment method to provide for emergency closing of a bypass station in such a way as to prevent early closing of the valve.
8 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
COMBINATION-TYPE ELECTRIC POWER STATION WITH GAS AND STEAM TURBINES | 1999 |
|
RU2217615C2 |
METHOD OF OPERATION OF STEAM TURBINE PLANT AND STEAM TURBINE PLANT FOR REALIZATION OF THIS METHOD | 1996 |
|
RU2070293C1 |
STEAM AND GAS PLANT BASED ON NPP | 2012 |
|
RU2489574C1 |
STEAM-GAS UNIT BASED ON NUCLEAR POWER PLANT | 2014 |
|
RU2553725C1 |
GAS TURBINE PLANT, HEAT RECOVERY STEAM GENERATOR AND METHOD TO OPERATE HEAT RECOVERY STEAM GENERATOR | 2009 |
|
RU2516068C2 |
STEAM-TURBINE THERMAL POWER PLANT OPERATING METHOD AND DEVICE FOR ITS IMPLEMENTATION | 2010 |
|
RU2432468C1 |
METHOD TO COOL DOWN WATER-COOLED REACTOR IN CASE OF NPP BLACKOUT | 2012 |
|
RU2499307C1 |
STEAM TURBINE NPP | 2015 |
|
RU2602649C2 |
WASTE HEAT-POWERED STEAM GENERATOR | 1998 |
|
RU2193726C2 |
HYDROGEN COMPLEX BASED ON HIGH-PRESSURE WATER ELECTROLYSIS FOR COMBINATION WITH NUCLEAR POWER PLANT | 2023 |
|
RU2821330C1 |
Authors
Dates
2014-05-20—Published
2011-02-15—Filed