FIELD: construction.
SUBSTANCE: system and method are proposed to install networks of channels and/or pipelines using a pipe base (1), support roller guide elements (2), preliminarily installed along the route (4) of the designed network of channels/pipeline. The number of elements (2) depends on length and characteristics of the route (4), and on the specified pipe base (1) there is a welding station (3), used to inspect and adjust pipes for formation of a system of channels/pipeline, and elements (2) have a support base (10) and a roller (2).
EFFECT: reduced time for assembly of a pipeline.
20 cl, 33 dwg
Authors
Dates
2014-05-20—Published
2009-03-04—Filed